• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

BIM + Technology in the Application of Mechanical and Electrical Installation of Super High-rise Building
Wang Rui, He Chunjun, Liu Zhirong, Su Xi
2016,8(3):6-13. doi: 10.16670/j.cnki.cn11-5823/tu.2016.03.02
Building Information Modeling sets up the building model based on the various relevant information and data of construction projects and simulates the real information of constructions by digital information simulation. The modeling is visualized and coordinated and can be imitated, optimized and plotted. Yong Li International Financial Center Project is a typical super high-rise building with core tube and steel structure inside. Its mechanical and electrical engineering contains chilled water, ventilation, electric, drainage, fire protection and so on, and the traditional method could not meet the detailed design need of the project, thus, BIM technology is adopted to deepen the design in the specialty. In the application of the technology, the team of this project continues to innovate. Bearing the idea of " BIM + " in mind, the team has found many new technologies for construction management, which greatly improves the whole management level. The article mainly introduces the implementation of BIM in this project.
key words: Super High-rise Building, Mechanical and Electrical Installation, BIM, Detailed Design

Year of publication

Related authors

Related hot words

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn