Citation: Zhengjun You, Xiongbin Li, Jun Yan. Research on Automatic Monitoring of Construction Risk of Freezing Barrier Removal in Silty Sand Layer under Operating Subway Station. Journal of Information Technologyin Civil Engineering and Architecture, 2023, 15(2): 62-67. doi: 10.16670/j.cnki.cn11-5823/tu.2023.02.11

2023, 15(2): 62-67. doi: 10.16670/j.cnki.cn11-5823/tu.2023.02.11

Research on Automatic Monitoring of Construction Risk of Freezing Barrier Removal in Silty Sand Layer under Operating Subway Station

1. 

Wuhan Metro Group Co., Ltd., 77 Happiness Avenue, Wuhan 430077, China

2. 

National Center of Technology Innovation for Digital Construction, Huazhong University of Science and Technology, Wuhan 430074, China

3. 

School of Civil & Hydraulic Engineering, Huazhong University of Science & Technology, Wuhan 430074, China

Corresponding author: 李雄彬,

Web Publishing Date: 2023-04-20

Fund Project: 国家自然科学基金重大项目 52192664

[1]

周诚, 王承山, 李勇军, 等. 地铁盾构隧道掘进地下障碍物处理技术[J]. 铁道工程学报, 2013(3): 86-90. 

[2]

张绍辉, 叶艳兵, 钟长记. 黏土地区地铁盾构隧道施工地下障碍物处理[J]. 施工技术, 2015, 44(S1): 224-228. 

[3]

王永佳. 复杂环境下的暗挖法清障技术[J]. 地下工程与隧道, 2014(4): 31-34+54. 

[4]

魏国文, 涂传尚, 周文青. 深层清障对邻近构筑物沉降的影响[J]. 工业建筑, 2020, 50(04): 93-96. 

[5]

徐建伟. 钻孔切割法清除地下障碍物的施工技术[J]. 建筑施工, 2013, 35(01): 26-28. 

[6]

吴洁妹, 赵永强, 袁俊相. 地下旧基础清障结合灌注桩作业的一体化施工关键技术[J]. 建筑施工, 2018, 40(12): 2026-2028. 

[7]

周建中, 汤烨, 尤波, 等. 地下障碍物深层清障施工技术的研究与应用[J]. 施工技术, 2018, 47(19): 104-107. 

[8]

向亮, 尹陇娟. 第三系富水粉细砂岩地层基坑冻结加固研究[J]. 铁道标准设计, 2021, 65(01): 81-88+121. 

[9]

潘希军. 粉细砂层中锚索施工涌水涌砂的处理技术[J]. 探矿工程(岩土钻掘工程), 2020, 47(10): 72-76. 

[10]

王俊利. 矿山法隧道粉细砂层大直径孤石处理技术[J]. 施工技术, 2014, 43(S2): 162-164. 

[11]

李官权. 破除地铁运营线车站围护结构关键技术研究[J]. 科学技术创新, 2021(20): 118-120. 

Metrics
  • PDF Downloads(9)
  • Abstract views(953)
  • HTML views(902)
Catalog

Figures And Tables

Research on Automatic Monitoring of Construction Risk of Freezing Barrier Removal in Silty Sand Layer under Operating Subway Station

Zhengjun You, Xiongbin Li, Jun Yan

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmxxjs  QQ:342182902  E-mail:tmxxjs@163.com