• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by:China Society and Technology Association
  • Organizer:China Graphics Society
  • Guidance:China Academy of Building Research

column
第五届“BIM技术在设计、施工及房地产企业协同工作中的应用”国际技术交流会在北京成功召开
2018, 10(5): 封二-封三.
Abstract PDF
A Practice and Thinking on Owner / Developer Supervised BIM Project Management——The A1 Tower of the Poly Yuzhu Project as an Example
Li Zheng, Chen Yangze, Yang Yuanfeng, Liu Zhenxin
2018, 10(5): 1-9. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.01
Abstract PDF
Application of BIM Technology in the Stadium Design for the 4th Division of Qatar World Cup 2022
Wei Xin, Zou Han
2018, 10(5): 10-15. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.02
Abstract PDF
Multi Party Collaborative Intelligent Management on Super Large Projects Based on BIM Technology
Yang Xiaoyi, Li Lihong, Lu Jianxin, Luo Shiwen, Tang Xinyuan
2018, 10(5): 16-24. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.03
Abstract PDF
Comprehensive Application of Intelligent Building Technology in Construction Projects with Special Shaped Structures of Jingdezhen Imperial Kiln Museum
Wan Renwei, Jiang Yueju, Zhang Dong, Han Yang, Xiao Xiaojiao
2018, 10(5): 25-32. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.04
Abstract PDF
BIM Application in the Whole Construction Process of PC Structure of Nanxiang Chenxiang Road Station Complex in Shanghai
Zhang Mingzheng, Yu Fangqiang, Cao Qiang, Gao Shang
2018, 10(5): 33-37. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.05
Abstract PDF
Research on BIM General Management System of Beijing Subway Line 19 and Its Demonstration Application in Typical Work Sites
Luo Ping, Wang Hui, Gao Yinying, Zhang Zhiwei, Du Xinming, Guan Huilong
2018, 10(5): 38-45. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.06
Abstract PDF
Research on BIM-Based Innovation in Project Completion Planning Acceptance of Shanghai International Tourism Resort
Lu Yang
2018, 10(5): 46-52. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.07
Abstract PDF
Integrated Application of BIM Technology in Project of Subway Line 7 East Extension 01 Section in Beijing
Zhang Yuanchun, Zhao Fuzhuang, Ti Yao, Wang Ning
2018, 10(5): 53-59. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.08
Abstract PDF
Comprehensive BIM Application in Super-Scaled Mexi River Double-Track Bridge of Zhengzhou-Wanzhou Railway in Fengjie
Wang Yingbin, Li Guohua, Wang Haifeng
2018, 10(5): 60-66. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.09
Abstract PDF
Application of BIM Technology in Fabricated Building——Taking Zhongke Mansion as an Example
Liu Pengkun, Qi Hongtuo, Teng Yue, Ma Yumeng, Liu Jiepeng
2018, 10(5): 67-73. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.10
Abstract PDF
Research on Campus Operation and Maintenance and Layout of Charging Piles for New Energy Vehicles Using GIS and BIM
Tang Wenkai, Wang Sijia, Tan Mulan
2018, 10(5): 74-80. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.11
Abstract PDF
Application of BIM Technology in the 5th Xiang-Ya Hospital of Central South University
Sun Yu, Chen Hongjie, Liu Wenyao
2018, 10(5): 81-89. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.12
Abstract PDF
Research on Application of BIM Technology in Dashu Intelligent Science and Technology Center Project
Wu Kai, Bai Zhengfang, Hua Feng, Wu Liping, Shi Dengfeng, Jin Kangxi
2018, 10(5): 90-98. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.13
Abstract PDF
Research on Software Configuration for BIM Forward Design Based on Revit
Chen Shaowei, Chen Jianjia, Jiao Ke
2018, 10(5): 99-103. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.14
Abstract PDF
Application of BIM Technology in Construction of Truss Layer Surrounding Core Tube Structure
Zhang Shuang, Fan Dongdong, Chen Zhixin
2018, 10(5): 104-107. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.15
Abstract PDF
Research on IFC Data Exchange for Substation Structures
Man Yanlei, Zhang Qilin, Chang Zhiguo
2018, 10(5): 108-112. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.16
Abstract PDF
Numerical Analysis of Interaction of Frame Shear Wall with Pile Raft Foundation and Rock Slope Subgrade
Yu Xin, Gan Tengjun, Liu Jinyang
2018, 10(5): 113-118. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.05.17
Abstract PDF