• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by:China Society and Technology Association
  • Organizer:China Graphics Society
  • Guidance:China Academy of Building Research

column
封面+封底
2020, 12(6): -3--3.
Abstract PDF
目录
2020, 12(6): -2--2.
Abstract PDF
Research of BIM Engine and Its Application
Zhang Jinhui, Zhang Qilin, Chang Zhiguo
2020, 12(6): 1-5. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.01
Abstract PDF
Study on BIM Forward Design of Bridge Engineering Based on Program Development
Chen Wang, Dai Jianguo
2020, 12(6): 6-11. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.02
Abstract PDF
Research on BIM Forward Design of Curtain Wall in Complex Buildings
Cheng Xiqi, Li Bei, Chen Bingren, Qiu Jizhun, Xu Zhiliang
2020, 12(6): 12-19. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.03
Abstract PDF
Linkage Mechanism of Fire Evacuation and Rescue in Subway Based on BIM + AHP
Wang Binghua
2020, 12(6): 20-25. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.04
Abstract PDF
Study on Construction Quality Management and Application of Expressway Based on BIM
Chen Fan, Chen Yan, Peng Gaochao, Chen Baoguang
2020, 12(6): 26-31. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.05
Abstract PDF
The Comprehensive Application of BIM Technology in the General Contracting Management of Boeing 737 Completion and Delivery Center Project
Zhang Tao
2020, 12(6): 32-39. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.06
Abstract PDF
Developing the Structural Information Model in Forward Design of BIM
Song Shubo, Yu Zhenqi, Zheng Fengzhong, Dai Yiming, Lin Jie, Wen Ruoting
2020, 12(6): 40-43. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.07
Abstract PDF
Intelligent Building System Integration Research Based on Digital Twin
Du Mingfang
2020, 12(6): 44-48. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.08
Abstract PDF
Practice on BIM Full Lifecycle Implementation in EPC Mode——Taking Project of Jiangbei New District Talent Apartment (No.1 Plot) in Nanjing as an Example
Tang Yuze, Sun Yuchen, Yu Jiang, Tang Juemin
2020, 12(6): 49-58. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.09
Abstract PDF
Hangzhou Metro 5 Phase I Project Application of BIM Technologies
Zhang Bo, Cai Huanjun
2020, 12(6): 59-65. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.10
Abstract PDF
Research on BIM Modeling Method of Large Diameter Shield Tunnel
Cui Xiao
2020, 12(6): 66-71. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.11
Abstract PDF
Application Research on Deepening Design of 128m Simply Supported Arch Bridge Based on BIM Technology
Wang Andong, Zhang Xuegang, Zhao Legang, Zhang Yun
2020, 12(6): 72-75. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.12
Abstract PDF
Research and Application of Engineering Construction Smart Supervision Platform From the Perspective of Data Fusion——Take the Engineering Management Information System of the Pearl Bay Development Authority of Guangzhou Nansha New Area as an Example
Hu Shan, Liu Yuanhui, Song Xiaokai
2020, 12(6): 76-81. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.13
Abstract PDF
Application of BIM Technology in Water Plant Engineering Construction Management
Yuan Jian
2020, 12(6): 82-86. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.14
Abstract PDF
Research on the Closed Loop Management System of BIM Online Education
Zhao Xuefeng, Hu Xiaoming, Chen Yingde, Chen Kexin, Li Danyang, Zhao Long
2020, 12(6): 87-93. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.15
Abstract PDF
Study on BIM Technologies Application in Large-Scale Building Complex Construction in Eastern Europe
Jiang Jiawei, Wang Kequan, Li Ziwen
2020, 12(6): 94-102. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.16
Abstract PDF
Comprehensive Application of BIM Technology in Songzhuang Cultural Center Project Design Stage
Wang Que, Cao Le, Lu Xiangyi, Hao Xuechao, Zhang Kai, Liu Lu, Liu Kunpeng, Cao Sheng, Tang Kaichun
2020, 12(6): 103-108. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.17
Abstract PDF
Guangzhou Metro Lines 18 and 22 Based on BIM Project Management Platform Research and Application
Chen Qian, Wei Zhangjun, Xu Chengyu
2020, 12(6): 109-117. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.18
Abstract PDF
Analysis on BIM Application in Medical Logistics Trolley System of Internal Medicine Building Project of Shenzhen People′s Hospital
Hu Huan, Guo Kongxu
2020, 12(6): 118-122. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.19
Abstract PDF
Application of BIM Technology in Construction General Contracting of Kaisa Financial Building
Li Pan, Wang Shangning, Zhu Chao, Luo Yeqin, Liao Yuhai, Wan Zhong, Wu Yating
2020, 12(6): 123-132. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.20
Abstract PDF
Exploration and Practice of BIM Technologies in Urban Tunnel EPC Project
Xi Lingzhi, Xin Weiming, Yang Yu, Mu Chaoyin
2020, 12(6): 133-140. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.21
Abstract PDF
Research on Information Model of Green Construction Evaluation Index and Influencing Factors Based on Green Construction Management and Control Platform
Ci Xiaole, Zhu Houhong, Zhu Jiadi
2020, 12(6): 141-148. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.22
Abstract PDF
Overview of the Application of Artificial Intelligence in Tower Crane Management
Shen Jie, Zou Dong
2020, 12(6): 149-155. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.23
Abstract PDF
BIM Technology Application of Comprehensive Commercial Land Project in the Southern District of Future Science and Technology City, Changping District, Beijing
Wang Man, Zhao Hujun, Li Jun, He Jingsu, Lian Guan, Zhang Hongfeng, Li Zuwen, Liu Junfeng
2020, 12(6): 156-165. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.24
Abstract PDF
Application and Practice Research of QR Code Technology in the Prevention and Control of COVID-19 Epidemic
Zhang Hao, Zuo Yi
2020, 12(6): 166-170. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.25
Abstract PDF
A Web-Based Real-Time Information Management and Control System for Shield Construction
Hou Baojun, Li Dawei, Li Ming, Gao Shu, Wang Hongliang, Wang Jincheng, Li Yangchun
2020, 12(6): 171-176. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.26
Abstract PDF
Design of Buttress Retaining Wall by Applying Civil 3D
Zhao Jinmao
2020, 12(6): 177-182. DOI: 10.16670/j.cnki.cn11-5823/tu.2020.06.27
Abstract PDF