• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by:China Society and Technology Association
  • Organizer:China Graphics Society
  • Guidance:China Academy of Building Research
Wang Kai. BIM Reverse Design Method for Green Facility Management[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(2): 88-91. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.02.15
Citation: Wang Kai. BIM Reverse Design Method for Green Facility Management[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(2): 88-91. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.02.15

BIM Reverse Design Method for Green Facility Management

  • Conventional green building design process already fails to satisfy the latest developmentofgreen facility management, which, to a certain extent, restricts the sustained and rapid development of green buildings. Many domestic design enterprises has been keeping exploringnew design methods to break the ceiling. This paper proposes a newreverse design method based on BIM of green building operation and maintenance, and introduces relevant exploration and research through practice. By using BIM, all data in design, construction and operation and maintenance period are getting through, and thegreen facility managementis truly implemented.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return