• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by:China Society and Technology Association
  • Organizer:China Graphics Society
  • Guidance:China Academy of Building Research
Wang Xiaogang, Li Tianyang. Integrated BIM Application in Hongdao High Speed Railway Station Project[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(4): 7-11. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.04.02
Citation: Wang Xiaogang, Li Tianyang. Integrated BIM Application in Hongdao High Speed Railway Station Project[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(4): 7-11. DOI: 10.16670/j.cnki.cn11-5823/tu.2018.04.02

Integrated BIM Application in Hongdao High Speed Railway Station Project

  • The HongDao Station for the Jinan-Qingdao high-speed railway project is the first station with sea-view in China, with construction scale of about 70 000 square meters. The project involves plenty of specialties and a wide number of drawings, which brings great difficulty to design coordination. The working procedure in the construction process is also complicated, making the organization of construction difficult as well. The BIM technology is applied in the whole process from the design to construction stage, and the cooperative management platform, the construction management platform and the component library platform are all used to build a complete implementation process and system, so as to realize the effective communication and cooperation of information among various specialties of construction drawing design, and improve the depth and quality of drawings, as well as the management capability of construction companies during the construction process. Therefore, the predictability, initiative and controllability of construction management are enhanced, the station building is ensured in construction quality, and the informatized construction management is improved. The works in this paper provide effective solution for the BIM application process and system in railway station building projects.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return