• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by:China Society and Technology Association
  • Organizer:China Graphics Society
  • Guidance:China Academy of Building Research
Zong Zhaomin, Wang Fulong, Yan Jinxin, Lu Jin, Ye Zhaochen. BIM Application in Theatre Project of the Central Opera House[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2019, 11(2): 13-18. DOI: 10.16670/j.cnki.cn11-5823/tu.2019.02.03
Citation: Zong Zhaomin, Wang Fulong, Yan Jinxin, Lu Jin, Ye Zhaochen. BIM Application in Theatre Project of the Central Opera House[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2019, 11(2): 13-18. DOI: 10.16670/j.cnki.cn11-5823/tu.2019.02.03

BIM Application in Theatre Project of the Central Opera House

  • The Central Opera Theatre project is located in the city center with narrow and limited area on-site for construction. The building possesses many stiffened structures, and the roof is in hyperboloid shape. The internal construction and hardcover inside the building involves many high-level requirements, which causing difficulties in construction practice. There are also numerous stage equipment and mechanical facilities inside the theatre to meet the requirements for acoustic and visual effects. Thus the BIM technology is applied to conduct rational site layout, as well as to optimize site layout at different construction stages. Through the BIM application, the high-efficiency management and control of rigid structure will be implemented throughout the design, production and construction stages. The project also attempts to use various new technologies and platforms of BIM in various directions to improve its fine management level, through which will also develop an excellent BIM team. Meanwhile, hopefully, this project will become a landmark theater building in Beijing.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return