• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by:China Society and Technology Association
  • Organizer:China Graphics Society
  • Guidance:China Academy of Building Research
Zhou Chichen, Zhou Zheng, Bai Jinxin. Application of BIM Technology in Construction of Super High-Rise Buildings——Taking Hangzhou AUX Building Project as An Example[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2019, 11(2): 79-84. DOI: 10.16670/j.cnki.cn11-5823/tu.2019.02.13
Citation: Zhou Chichen, Zhou Zheng, Bai Jinxin. Application of BIM Technology in Construction of Super High-Rise Buildings——Taking Hangzhou AUX Building Project as An Example[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2019, 11(2): 79-84. DOI: 10.16670/j.cnki.cn11-5823/tu.2019.02.13

Application of BIM Technology in Construction of Super High-Rise Buildings——Taking Hangzhou AUX Building Project as An Example

  • With the rapid development of China's economy, construction technology has been undergoing tremendous changes. Among them, the super high-rise building has higher requirements than the conventional construction technology because of its complex structure and detached height. The AUX building project in Hangzhou possesses characteristics of numerous specialty subcontracting, tight construction period, Limited construction site and difficult construction of super high-rise. Facing the many difficulties, the BIM technology is applied in the project in many areas including drawings review, collision inspection, deepening design, simulation of key and difficult processes, site layout, model lead, quality and safety, dynamic schedule management, cost accounting, and etc. Aiming at fine management and assisted by information and data integration, the application of BIM technology provides a scheme and basis for solving the problems of technology, production and cost in the construction of this project.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return