• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by:China Society and Technology Association
  • Organizer:China Graphics Society
  • Guidance:China Academy of Building Research
Shuai Zou. The Application of BIM Digital Delivery Platform During the Project Feasibility Stage[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2021, 13(4): 74-79. DOI: 10.16670/j.cnki.cn11-5823/tu.2021.04.11
Citation: Shuai Zou. The Application of BIM Digital Delivery Platform During the Project Feasibility Stage[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2021, 13(4): 74-79. DOI: 10.16670/j.cnki.cn11-5823/tu.2021.04.11

The Application of BIM Digital Delivery Platform During the Project Feasibility Stage

  • An IFC-based digital project delivery platform is developed regarding features of project feasibility stage. BIM technology is adapted in pre-construction stage, a BIM model is implemented for project feasibility stage application. It can record various technico-economical indexs needed during pre-construction stage and assist reviewers understand overall project plan intuitively. Reviewers make their judgement to project validity and compliance very quickly, pre-construction approval process can be advanced and efficiency of project implementation can be promoted.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return