• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by:China Society and Technology Association
  • Organizer:China Graphics Society
  • Guidance:China Academy of Building Research
Mingquan Hu, Annan Jiang, Honglong Wang, Shuai Zheng, Yan Wang, Yi Tao. BIM Management and Implementation in Metro Station Project with Arch-Cover Method[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2022, 14(1): 13-19. DOI: 10.16670/j.cnki.cn11-5823/tu.2022.01.03
Citation: Mingquan Hu, Annan Jiang, Honglong Wang, Shuai Zheng, Yan Wang, Yi Tao. BIM Management and Implementation in Metro Station Project with Arch-Cover Method[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2022, 14(1): 13-19. DOI: 10.16670/j.cnki.cn11-5823/tu.2022.01.03

BIM Management and Implementation in Metro Station Project with Arch-Cover Method

  • For promoting the implementation of BIM Technology in the design and construction of metro station by using Arch-Cover method, this paper has made studies based on the scheme of BIM. According to the characteristics of structure, anchor, and other components during the design and construction process, with the assisting of Revit to make secondary development, a parametric way to support Arch-Cover method has been established to generate the relevant components. In addition, with the adoption of SQL database, a plugin for enabling visual management has been developed. This study has validated the feasibility of the proposed solution through the preliminary experiment in Shikuilu Station in Line 5 of Dalian Metro.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return