Lin Jiarui, Zhang Jianping, Zhong Yaofeng. Schedule-resource Trade-off Modeling and Application based on 4D-BIM[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(6): 44-49.
Citation: Lin Jiarui, Zhang Jianping, Zhong Yaofeng. Schedule-resource Trade-off Modeling and Application based on 4D-BIM[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(6): 44-49.

Schedule-resource Trade-off Modeling and Application based on 4D-BIM

  • According to the key requirements in schedule and resource management during construction, an approach for schedule-resource trade-off problem was established based on 4 Dimensional Building Information Model (4D-BIM) proposed by Tsinghua. With the transforming mechanics between 4D-BIM and Discrete Event Simulation model, schedule-resource trade-off model can be achieved automatically. In addition, the paper explores and analyses the process of SA algorithm in order to tackle the schedule-resource trade-off. The whole solution was applied to a real project and illustrated a good result. The result indicates that the automatic schedule-resource trade-off modelling can free people from intensive work, and reduces repetitive work, which provides managers with a practical tool for schedule arrangement and resource allocation.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return