基于BIM & PtD的斜拉桥施工安全风险检查
1. | 南京林业大学 研究生院,南京 210018 |
2. | 南京林业大学 土木工程学院,南京 210018 |
Construction Safety Risk Inspection of Cable-Stayed Bridge Based on BIM & PtD
1. | Graduate School, Nanjing Forestry University, Nanjing 210018, China |
2. | School of Civil Engineering, Nanjing Forestry University, Nanjing 210018, China |
引用本文: 万寅子, 李希胜, 何琴琴. 基于BIM & PtD的斜拉桥施工安全风险检查[J]. 土木建筑工程信息技术, 2022, 14(1): 69-75. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.09
Citation: Yinzi Wan, Xisheng Li, Qinqin He. Construction Safety Risk Inspection of Cable-Stayed Bridge Based on BIM & PtD[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2022, 14(1): 69-75. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.09
摘要:针对斜拉桥施工安全,提出一种基于BIM(Building Information Modeling)和PtD(Prevention through Design)的施工风险控制方法。在Access平台下建立斜拉桥施工安全风险知识库(PtD知识库),确定相关风险因素、预控措施及其对应ID编码。基于BIM模型,对Revit进行二次开发,创建具有Ribbon菜单和WPF界面的“斜拉桥施工安全风险检查工具(BCSRI)”模块,实现了设计阶段斜拉桥施工安全风险因素及其ID的自动检查。以斜拉桥索塔施工安全风险检查为例,验证该方法的可行性。
Abstract: Focusing on the safety construction of Cable-Stayed bridge, BIM-based(Building Information Modeling-based)and PtD-based(Prevention Through Design-based)methods are being proposed for ensuring the risk control of the construction. The knowledge database for the safety construction(PtD Knowledge Database)of cable-stayed bridge is being established under Access Platform for the determination of those relevant risk factors, pre-control measures, and relevant ID codes. Based on BIM models, Autodesk Revit is being further developed for the establishment of"Cable-Stayed Bridge Construction Safety Risk Inspection Tool(BCSRI)"module with the inclusion of Ribbon menu and WPF interface, which is achieving the automation of Cable-Stayed bridge construction safety risk factors and their IDs inspections during the design stage. The feasibility of the proposed method is being verified by taking the example of safety risks inspections along the Cable-Stayed bridge construction.
[1] |
李皓燃. 面向设计过程的装配式建筑施工安全风险控制研究[D]. 南京: 东南大学, 2018. |
[2] |
林锦腾. 基于灰色模糊层次分析理论的斜拉桥施工风险评估[J]. 城市道桥与防洪, 2019, (8): 178-182. |
[3] |
杨珍珍, 樊燕燕. 基于ISM与AHP的斜拉桥主梁施工阶段风险分析[J]. 工程管理学报, 2018, 32(3): 124-128. |
[4] |
安朗. 基于MCMC-CCRAA的大跨径斜拉桥施工风险预警模型[J]. 公路交通科技, 2017, 34(10): 42-50. |
[5] |
汤天明, 管义能, 王国斌, 等. 武汉青山长江公路大桥施工阶段安全风险评估[J]. 桥梁建设, 2020, 50(Z1): 38-43. |
[6] |
Zhang, S, et al. Building Information Modeling(BIM)and Safety: Automatic Safety Checking of Construction Models and Schedules[J]. Automation in Construction, 2013, 29: 183-195.doi: 10.1016/j.autcon.2012.05.006 |
[7] |
Hossain, M. A, et al. Design-for-Safety Knowledge Library for BIM-integrated Safety Risk Reviews[J]. Automation in Construction, 2018, 94: 290-302.doi: 10.1016/j.autcon.2018.07.010 |
[8] |
Guo, H, et al. BIM and Safety Rules Based Automated Identification of Unsafe Design Factors in Construction[J]. Procedia Engineering, 2016, 467-472. |
[9] |
Yuan, J, et al. Accident Prevention through Design(PtD): Integration of Building Information Modeling and PtD Knowledge Base[J]. Automation in Construction, 2019, 102: 86-104. |
[10] |
刘金海. 大跨斜拉桥施工安全风险评价[D]. 武汉: 华中科技大学, 2011. |
[11] |
张自荣, 薛进, 李超. 斜拉桥施工监理技术[M]. 北京: 人民交通出版社, 2010: 58- 60. |
[12] |
张帆. 大跨径公路斜拉桥索塔施工安全风险分析与控制研究[D]. 重庆: 重庆交通大学, 2013. |
[13] |
曹璐琳, 李希胜, 吴佳蔚, 等. 基于BIM-CSKB的建筑施工安全风险核查[J]. 四川建筑科学研究, 2017, 43(4): 146-151. |
[14] |
袁志美, 周兰庭, 徐长华. 基于BIM的泵站施工安全风险辨识与应用[J]. 排灌机械工程学报, 2020, 38(2): 157-162. |
[15] |
Getuli, V, et al. BIM-based Code Checking for Construction Health and Safety[J]. Procedia Engineering, 2017: 454-461. |
计量
- PDF下载量(37)
- 文章访问量(1824)
- HTML全文浏览量(1005)