Citation: Hu Shan, Liu Yuanhui, Song Xiaokai. Research and Application of Engineering Construction Smart Supervision Platform From the Perspective of Data Fusion——Take the Engineering Management Information System of the Pearl Bay Development Authority of Guangzhou Nansha New Area as an Example. Journal of Information Technologyin Civil Engineering and Architecture, 2020, 12(6): 76-81. doi: 10.16670/j.cnki.cn11-5823/tu.2020.06.13
2020, 12(6): 76-81. doi: 10.16670/j.cnki.cn11-5823/tu.2020.06.13
Research and Application of Engineering Construction Smart Supervision Platform From the Perspective of Data Fusion——Take the Engineering Management Information System of the Pearl Bay Development Authority of Guangzhou Nansha New Area as an Example
Pearl Bay Development Authority of Guangzhou Nansha New Area, Guangzhou 511455, China |
As a pioneering demonstration area in the Guangdong-Hong Kong-Macao Greater Bay Area, The Pearl Bay starting area has already been deployed for the construction of a "smart city" demonstration zone. The Engineering Management Information System of the Pearl Bay Development Authority focuses on the work points of the Administration, serves the construction of the Pearl Bay starting area Project supervision and integrates "operations, management, and decision-making" to achieve the whole process supervision of project approval, design, construction, inspection, and comprehensive evaluation, which builds an information foundation for the subsequent management and operation of smart cities. Based on the concept of data fusion, this paper analyzes the data fusion method and process of the system at the data layer, business application layer, and decision application layer. The system is based on the basic construction procedure and the spatiotemporal data fusion method of map grid, which can provides a certain reference for the data integration design of smart supervision platform for engineering construction in other new districts.
[1] |
广州市国土资源和规划委员会.广州市城市总体规划(2017-2035)[EB/OL](2020-11-3)http://113.108.174.131/pub/gtzyghwyh/hdjl/zjyj/201802/W020180225000925672953.pdf. |
[2] |
明珠湾开发建设管理局.营商环境[EB/OL](2020-11-3)http://www.gzns.gov.cn/tzns/mzwq/yshj/. |
[3] |
中国建筑学会.BIM应用发展报告(2019)[R].中国建筑工业出版社: 北京, 2020, 42-44. |
[4] |
ATREY P K, HOSSAIN M A, EL SADDIK A, et al.Multimodal fusion for Multimedia analysis:a survey[J).Multimedia Systems, 2010, 16(6): 345-379.doi: 10.1007/s00530-010-0182-0 |
[5] |
徐瑞, 崔麟, 次晓乐, 等.南沙青少年宫项目智慧工地信息化系统集成应用研究[J].土木建筑工程信息技术, 2020, 12(4):40-47. |
[6] |
胡珊, 苏军, 梁珩, 等.信息化工程管理模式的创新实践研究——以广州市南沙新区明珠湾开发建设管理局工程管理信息系统为例[J].土木建筑工程信息技术, 2020, 12(5):64-69. |
Metrics
- PDF Downloads(39)
- Abstract views(2222)
- HTML views(1627)