2023, 15(2): 31-36. doi: 10.16670/j.cnki.cn11-5823/tu.2023.02.06
BIM轻量化管理平台工程量统计功能开发与实现
北京建筑大学 土木与交通工程学院,北京 100044 |
BIM Lightweight Management Platform Engineering Quantity Statistics Function Development and Implementation
School of Civil and Traffic Engineering, Beijing University of Civil Engineering and Architecture, Beijing 100044, China |
引用本文: 熊天海, 王亮, 张瑞强, 李洁, 郭丽荣, 陶军. BIM轻量化管理平台工程量统计功能开发与实现[J]. 土木建筑工程信息技术, 2023, 15(2): 31-36. doi: 10.16670/j.cnki.cn11-5823/tu.2023.02.06
Citation: Tianhai Xiong, Liang Wang, Ruiqiang Zhang, Jie Li, Lirong Guo, Jun Tao. BIM Lightweight Management Platform Engineering Quantity Statistics Function Development and Implementation[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2023, 15(2): 31-36. doi: 10.16670/j.cnki.cn11-5823/tu.2023.02.06
摘要:由于项目工程算量信息在建筑工程项目中的重要性以及传统BIM软件对计算机硬件条件的依赖,导致BIM技术在工程项目成本管理中难以应用。本文通过Dynamo对混凝土构件柱、梁及板之间的扣减关系进行了修正,并利用Revit二次开发对修正后的模型进行了轻量化处理,导出了glTF轻量化格式、控制构件聚合关系的结构树文件以及导出符合我国计价规范的清单工程量。最后基于Three.js图形引擎,通过HTML、CSS及JavaScript搭建了BIM轻量化平台,实现了BIM模型Web端的快速加载,并利用构件UniqueID实现了模型构件与清单工程量信息的匹配,实现Web平台算量信息在线统计。最后导入BIM模型案例对本研究进行验证,实际效果满足要求。
Abstract: It is difficult to implement BIM technology in project cost management due to the importance of project engineering calculation information in construction projects and the dependence of computer hardware in traditional BIM software. In this paper, the deduction relationship among concrete member column, beam, and slab is revised by Dynamo. The revised model is lightened by using Revit secondary development, then exporting glTF light format, structural tree file controlling the aggregation relationship of members, and the list quantity of work in accordance with China's pricing specification. Finally, based on Three.js graphics engine, the BIM lightweight platform is built by HTML, CSS and JavaScript to achieve the fast loading of BIM models on the website. By using component UniqueID, the paper succeeds in the matching model components with list quantity information and achieves online statistics of quantity information on the web platform. Finally, the BIM model case is imported to verify that the actual effect of this study meets the requirements.
[1] |
王巧雯, 张加万, 牛志斌. 基于建筑信息模型的建筑多专业协同设计流程分析[J]. 同济大学学报(自然科学版), 2018, 46(08): 1155-1160. |
[2] |
Zhao X. A Scientometric Review of Global BIM Research: Analysis and Visualization[J]. Automation in Construction, 2017, 80. |
[3] |
Sampaio AZ, Antunes B G, NMD Almeida. Quantity Take-Off Process Supported by Building Information Modeling (BIM) Methodology[J]. 2021. |
[4] |
Liu H, Ming L, Al-Hussein M. Ontology-based semantic approach for construction-oriented quantity take-off from BIM models in the light-frame building industry[J]. Advanced Engineering Informatics, 2016, 30(2): 190-207.doi: 10.1016/j.aei.2016.03.001 |
[5] |
孙艳, 裴振保, 韦伟. 基于Mashup框架的商业智能前端工具的设计[J]. 计算机与现代化, 2013(9): 219-225. |
[6] |
黄轩安, 张群力, 方波, 等. BIM集成技术在2022年杭州亚运会曲棍球场馆数字化建造中的应用[J/OL]. 土木建筑工程信息技术: 1-13[2021-08-18]. |
[7] |
杜欣俊. BIM技术在城市综合管廊设计中的应用研究[J]. 土木建筑工程信息技术, 2021, 13(05): 102-107. |
[8] |
吴佳丽, 蒋风香, 胡妮妮. 基于BIM技术的施工图概预算方法研究[J]. 山西建筑, 2017, 43(07): 232-234. |
[9] |
徐铭, 赵校. 从基于BIM的工程量计算角度探讨智慧建设的实现[J]. 城市住宅, 2019, 26(07): 34-38. |
[10] |
陆凯凤. 基于Revit平台的BIM构件处理工具软件研发[J/OL]. 土木建筑工程信息技术: l-6[2020-05-11]. |
[11] |
李洁. 混凝土工程参数化建模与清单算量二次开发研究[D]. 北京建筑大学, 2021. |
计量
- PDF下载量(37)
- 文章访问量(1843)
- HTML全文浏览量(1683)