2017, 9(6): 42-47. doi: 10.16670/j.cnki.cn11-5823/tu.2017.06.07
广西南宁航洋信和广场BIM技术综合应用
南昌工学院,南昌 330108 |
Comprehensive Application of BIM Technology in Nanning Air and Sea Plaza
Nanchang Institute of technology, Jiangxi, Nanchang 330108 |
引用本文: 周继登, 彭小平, 杨万余, 曾丹美, 雷金阳, 邓凌, 梁钰彬, 周玉杰, 周杨, 沈华新, 周心怡. 广西南宁航洋信和广场BIM技术综合应用[J]. 土木建筑工程信息技术, 2017, 9(6): 42-47. doi: 10.16670/j.cnki.cn11-5823/tu.2017.06.07
Citation: Zhou Jideng, Peng Xiaoping, Yang Wanyu, Ceng Danmei, Lei Jinyang, Deng Ling, Liang Yubin, Zhou Yujie, Zhou Yang, Shen Huaxin, Zhou Xinyi. Comprehensive Application of BIM Technology in Nanning Air and Sea Plaza[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(6): 42-47. doi: 10.16670/j.cnki.cn11-5823/tu.2017.06.07
摘要:广西南宁航洋信和广场项目是集办公楼、商业城、地下室等为一体的超高层建筑,总建筑面积达42万m2。工程占地面积大、工期长、机电工程规模庞大、系统联动调试复杂、垂直管线多、各种专业设备错综复杂是工程的重点难点,本项目把BIM技术作为工程管理和技术手段,覆盖了设计与施工组织的各个环节,包括图纸会审、协同设计、管线综合优化、深化设计、成本控制、VR虚拟等,保证了项目的成功实施,解决了多处图纸问题及多处碰撞问题,提高了工程建设质量和项目综合管理水平。
Abstract: The Nanning Air and Sea Plaza project is a high-rise building integrating the office building, business center and basement as a whole, with total construction area of 420 thousand square meters. In this construction project, the key points and main difficulties include large construction area, long construction period, large scaled mechanical and electrical engineering, complex system linkage debugging, multiple vertical pipelines, complex professional equipment in all entire professions, and etc. This project takes the BIM technology as the project management and technical measures, covering all aspects of the design and construction of the organization, including joint examination of construction drawings, collaborative design, integrated optimization of pipelines, design development, cost control, VR virtual, and etc. Application of BIM has ensured the successful implementation of the project, solved multiple graph problems of collisions, and finally improved the quality of the project construction and the comprehensive management level of the project.
计量
- PDF下载量(35)
- 文章访问量(2663)
- HTML全文浏览量(996)