一次高完成度的BIM设计实践——三亚财经国际论坛永久会址
广州市设计院,广州 510620 |
Design Control of High-level Accomplished Projects :BIM-based Design Practice of Sanya Forum Permanent Site
Guangzhou Design Institute, Guangzhou 510620, China |
引用本文: 李丹. 一次高完成度的BIM设计实践——三亚财经国际论坛永久会址[J]. 土木建筑工程信息技术, 2016, 8(2): 1-5. doi: 10.16670/j.cnki.cn11-5823/tu.2016.02.01
Citation: Li Dan. Design Control of High-level Accomplished Projects :BIM-based Design Practice of Sanya Forum Permanent Site[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(2): 1-5. doi: 10.16670/j.cnki.cn11-5823/tu.2016.02.01
摘要:三亚财经国际论坛永久会址项目,定位于能够满足最高级别的国内和国际政治、金融会议及会展需求,方案构思新颖,造型独特,具有较高的设计难度和实施难度本文全面、系统地介绍了该项目BIM设计的组织方式与应用情况,从初步设计开始直到后期施工配合,BIM设计在应对这种复杂形体的土建定位、管线综合设计过程中具有不可替代的作用尤其在面对最为复杂的无数理规律的幕墙系统时,BIM使得设计、生产、施工紧密结合,有效进行。同时,BIM设计也对室内净高、绿建相关设计起到了优化作用。最终的建成情况也印证了借助BIM设计这一利器,不仅圆满完成了设计任务,同时也达到了较高的完成度。
Abstract: With novel design and unique shape, Sanya Forum Permanent Site Project aims to meet the requirements of the highest level of domestic and international political and financial conference of exhibition, which is of high design as well as implementation difficulty. This article comprehensively and systematically introduces the organization mode and application of BIM-based design in this project. From the primary design to later period of construction cooperation, BIM-based design plays an irreplaceable role in the process of coping with civil engineering location and comprehensive pipeline design of complicated form. Especially when confronting with the most complex curtain wall system without mathematical rules, BIM renders to the close combination of design, production and construction and works effectively. Meanwhile, BIM-based design optimizes internal clear height green building-related design. The final completion also shows that BIM-based design not only completes the design task successfully, but also reaches high-level accomplishments.
[1] |
王宇, 常茜.工欲善其事, 必先利其器——BIM实践案例及经验体会[J].建筑学报, 2011(06):101-104.doi: 10.3969/j.issn.0529-1399.2011.06.017 |
[2] |
葛清主编.BIM第一维度——项目不同阶段的BIM应用[M].中国建筑工业出版社, 2013. |
[3] |
葛兰文主编.BIM第二维度——项目不同参与方的BIM应用[M].中国建筑工业出版社, 2011. |
[4] |
欧特克软件(中国)有限公司.可持续设计分析和建筑信息模型[M].上海:第三届工程建设计算机应用创新论坛论文集, 2011:348-357. |
[5] |
傅筱.一种相对关系的推敲——BIM作为建筑构思和深化的设计工具[J].时代建筑, 2013(02):26-29.doi: 10.3969/j.issn.1005-684X.2013.02.006 |
[6] |
任爱珠.从"甩图板"到BIM——设计院的重要作用[J].土木工程信息技术, 2014, 6(1):1. |
[7] | |
[8] |
陈剑佳, 焦柯, 杨远丰.基于Revit建筑结构施工图表达的实用方法[J].土木工程信息技术, 2015, 7(5):128-34. |
[9] |
何永祥, 潘志广, 黄世超.BIM技术在施工图绘制中的应用研究[J].土木建筑工程信息技术, 2013, 5(2):15-22. |
[10] |
曾旭东, 王大川, 陈辉.参数化建模[M].湖北:华中科技大学出版社, 2011. |
计量
- PDF下载量(16)
- 文章访问量(1919)
- HTML全文浏览量(823)