2013, 5(3): 87-89, 105.
BIM技术在项目前期策划方面的应用
上海建科工程咨询有限公司,上海 200032 |
BIM Application in the Project Prophase Planning
Shanghai Jianke Engineering Consulting Co., Ltd., Shanghai 200032, China |
引用本文: 吴玲倩, 刘尚亮. BIM技术在项目前期策划方面的应用[J]. 土木建筑工程信息技术, 2013, 5(3): 87-89, 105.
Citation: Wu Lingqian, Liu Shangliang. BIM Application in the Project Prophase Planning[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2013, 5(3): 87-89, 105.
摘要:项目前期策划是全过程项目管理的主要阶段,有效的项目前期策划对建设项目的成本、工期及运作有着积极的影响,是项目建设成功的前提。BIM技术的出现,可能成为克服传统方法弊端和提升策划和决策水平的利器,用来提升社会整体的项目策划能力和水平,以和现代建设项目的高要求相匹配。
Abstract: Pre-project planning is the major phases of the whole process of project management, and effective project preliminary planning has a positive impact for the cost of construction project, construction and operation.Whih is also prerequisites of the success of project construction.The emergence of BIM technology might be overcome disadvantages in traditional method and enhance the level of planning and decision making.It also can be used to improve the whole project planning ability and the level, and match the high requirements of the modern construction project.
[1] |
G.EdwardGibsonJr, Yu-RenWang, Chung-SukCho, etal.WhatisPreProjectPlanning, Anyway?[J].JournalofManagementinEngineering, 2006, (1):35~42. |
[2] |
GUOHL, LIH, SKITMOREM.LifecyclemanagementofconstructionprojectsbasedonVirtualPrototypingtechnology[J].JournalofManagementinEngineering. |
[3] | |
[4] |
Rjorr.GIS/DSSModelsforQatarEconomicZones[EB/OL].http://crgp.stanford.edu/news/global_projects_gisdss_models_for_qatar_economic_zones.html, 2007-11-07. |
[5] |
Participants.URL:http://buildingsmart-tech.org/certification/ifc-certification-2.0/ifc2x3-cv-v2.0-certification/participants. |
[6] |
Participants.URL:http://buildingsmart-tech.org/certification/ifc-certification-2.0/ifc2x3-cv-v2.0-certification/participants. |
[7] |
Song, Yonghui, Hamilton, Andy.BuiltenvironmentdataintegrationusingnDmodeling[J].ElectronicJournalofInformationTechnologyinConstruction.2007(12):429-442. |
[8] |
Participants.URL: http://buildingsmart-tech.org/certification/ifc-certification-2.0/ifc2x3-cv-v2.0-certification/participants. |
[9] |
董建峰, 梁晓.基于数据协同的日本勘察设计行业信息化发展[J].土木建筑工程信息技术.2010(03):104-110.doi: 10.3969/j.issn.1674-7461.2010.03.018 |
[10] |
Halfawy, MahmoudM.R, Froese, ThomasM.Component-basedframeworkforimplementingintegratedarchitectural/engineering/constructionprojectsystems[J].JournalofComputinginCivilEngineering.2007(21):441-452. |
[11] | |
[12] |
王广斌, 张洋, 谭丹.基于BIM的工程项目成本核算理论及实现方法研究[J].科技进步与对策, 2009(21):47-49. |
[13] |
何关培. BIM技术应用丛书[M]. 建筑工业. 2011. |
计量
- PDF下载量(14)
- 文章访问量(1225)
- HTML全文浏览量(1014)