2018, 10(4): 12-16. doi: 10.16670/j.cnki.cn11-5823/tu.2018.04.03
基于Revit二次开发的PC建筑预制率计算方法研究
郑州大学土木工程学院,郑州 450001 |
Research on Calculation Method for PC Building Prefabrication Rate Based on Revit Secondary Development
School of Civil Engineering, Zhengzhou University, Zhengzhou 450001, China |
引用本文: 陈远, 康虹. 基于Revit二次开发的PC建筑预制率计算方法研究[J]. 土木建筑工程信息技术, 2018, 10(4): 12-16. doi: 10.16670/j.cnki.cn11-5823/tu.2018.04.03
Citation: Chen Yuan, Kang Hong. Research on Calculation Method for PC Building Prefabrication Rate Based on Revit Secondary Development[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(4): 12-16. doi: 10.16670/j.cnki.cn11-5823/tu.2018.04.03
摘要:为改进目前预制装配式建筑预制率手工计算存在效率低下、误差加大的问题,本研究利用建筑信息模型BIM技术,通过对Revit软件的二次开发,实现了对基于BIM模型的预制装配式混凝土建筑(Precast Concrete,简称PC)预制构件工程量的自动统计和预制率的自动计算,验证了基于Revit平台计算PC建筑预制率的可行性。利用本文的二次开发成果,通过不同构件预制率的动态选择组合,可以估算建设成本,进而选择成本可接受范围内的预制方案,增加经济效益,为决策者制定预制方案提供决策依据。
Abstract: In order to improve the current prefabricated building prefabrication rate calculation, and to solve the problems of low efficiency and large error existed in the manual calculation, this study applies the BIM technologyto achieve the automatic statistics of precast concrete components and automatic calculation of precast rate for a PC building based on its BIM model through the secondary development on Revit, which verifies the feasibility of calculating PC building precast rate based on Revit platform. Based on the results of secondary development in this paper, the construction cost can be estimated directly when selecting different combinations of prefabrication rates, and then the prefabrication schemes within acceptable cost range can be selected, to increase economic benefits, and to provide decision-making basis for decision makers to formulate prefabrication schemes.
[1] |
于龙飞, 张家春.基于BIM的装配式建筑集成建造系统[J].土木工程与管理学报, 2015(04): 73-78.doi: 10.3969/j.issn.2095-0985.2015.04.012 |
[2] |
Azhar S.Building Information Modeling (BIM):Trends, Benefits, Risks, and Challenges for the AEC Industry[J].Leadership and Management in Engineering, 2011, 11(3):241-252.doi: 10.1061/(ASCE)LM.1943-5630.0000127 |
[3] | |
[4] |
Kim M K, Wang Q, Park J W, et al.Automated dimensional quality assurance of full-scale precast concrete elements using laser scanning and BIM[J].Automation in Construction, 2016, 102-114. |
[5] |
Guan D, Guo Z, Zhang C.Research on Precast Concrete Structures with BIM Involving Information on Structural Details and Behaviors[J].Engineering Village, 2015, 222-228. |
[6] |
Li K.The application of BIM technology in prefabricated assembly concrete structure design[J].Engineering Village, 2017, 472-476. |
[7] | |
[8] |
钱海, 马小军, 来侃.基于Revit二次开发的电气设备族平台的搭建[J].土木建筑工程信息技术, 2015(04): 60-64. |
[9] |
田炜, 朱海, 刘智龙.建筑单体工业化程度评价标准新计算方式研究[J].中外建筑, 2016(07): 130-132. |
计量
- PDF下载量(41)
- 文章访问量(2394)
- HTML全文浏览量(889)