保利国际金融城BIM技术应用总结
中建三局第一建设工程有限责任公司,武汉 430000 |
The Application of BIM Technology in Poly International Financial City
China Construction Third Bureau First Engineering Co., Ltd., Wuhan 430000, China |
引用本文: 周永明, 寇广辉, 苏浩. 保利国际金融城BIM技术应用总结[J]. 土木建筑工程信息技术, 2017, 9(3): 25-30. doi: 10.16670/j.cnki.cn11-5823/tu.2017.03.04
Citation: Zhou Yongming, Kou Guanghui, Su Hao. The Application of BIM Technology in Poly International Financial City[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(3): 25-30. doi: 10.16670/j.cnki.cn11-5823/tu.2017.03.04
摘要:超高层总承包施工对深化设计和协同工作具有很高的要求,随着BIM、实景建模、激光扫描等新技术的应用,深化设计、协同管理变得越来越高效和落地。本项目对本文针对保利金融城项目基于BIM的协同工作、深化设计、计划管理等应用进行了简要介绍和总结。
Abstract: For the general construction contractors of ultra-high-rise buildings, there are high requirements on the detailed design and collaborative work. With the applications of new technologies like BIM, image modeling, laser scanning, and etc., the collaborative design management becomes increasingly efficient. This paper is a brief introduction and summary on the application of BIM cooperation, detailed design and plan management of the Poly International Financial City.
[1] |
刘欣. 基于BIM的大型建设项目进度计划与控制体系研究[D]. 山东建筑大学, 2013. |
[2] |
周永明, 寇广辉, 苏浩.广州琶洲眼项目BIM综合应用技术总结[J].土木建筑工程信息技术, 2016, 8((02):23-31. |
[3] |
杨建文, 王喜利.三维空间数据采集与BIM模型相结合的应用[J].科技展望, 2015, (27):166.doi: 10.3969/j.issn.1672-8289.2015.27.154 |
计量
- PDF下载量(39)
- 文章访问量(2349)
- HTML全文浏览量(1095)