Citation: Jin Huazhong, Zou Yiquan, Zhu Zhenfan, Liu Yang. Research on Production Arrangement Modes of PC Components for the Production Line. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(2): 88-93. doi: 10.16670/j.cnki.cn11-5823/tu.2018.02.18
2018, 10(2): 88-93. doi: 10.16670/j.cnki.cn11-5823/tu.2018.02.18
Research on Production Arrangement Modes of PC Components for the Production Line
1. | School of Computer Science, Hubei University of Technology, Wuhan 430068, China |
2. | School of Civil Engineering, Architecture and Environment, Hubei University of Technology, Wuhan 430068, China |
The production capacity is one of the key indicators reflecting the factory producing prefabricated components, and the production arrangement mode of the components will have direct effects on the production efficiency and capability of prefabricated components. This paper applies the simulation experiment using Anylogic for the better automatized external wall prefabrication line, to analyze and calculate the productivity of PC components under the free-beat and fixed-beat production arrangement modes, respectively, and to discuss the applicable conditions for different production arrangement modes.
[1] |
许杰峰, 鲍玲玲, 马恩成, 夏绪勇, 姜立.基于BIM的预制装配建筑体系应用技术[J].土木建筑工程信息技术, 2017, 8(4): 17-20. |
[2] |
祁建, 霍光, 李宣.PC自动化生产线养护工艺及养护系统研究[J].混凝土世界, 2016(05): 84-87.doi: 10.3969/j.issn.1674-7011.2016.05.015 |
[3] |
李应.装配式建筑构件生产工艺设计探讨[J].混凝土与水泥制品, 2017(12): 65-68.doi: 10.3969/j.issn.1000-4637.2017.12.016 |
[4] |
孙红, 孙健, 吴玉厚, 赵凯军.大型智能PC构件自动化生产线简介[J].混凝土与水泥制品, 2015(03): 35-38.doi: 10.3969/j.issn.1000-4637.2015.03.009 |
[5] |
单庆超, 张秀媛, 张朝峰.社会力模型在行人运动建模中的应用综述[J].城市交通, 2011, 9(7): 71-77. |
[6] |
陈韶飞, 李弘, 夏文杰.基于Anylogic的商业银行排队系统仿真研究[J].科技通报, 2016, 32(08): 210-214.doi: 10.3969/j.issn.1001-7119.2016.08.048 |
Metrics
- PDF Downloads(31)
- Abstract views(2629)
- HTML views(1199)