2017, 9(2): 24-29. doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.04
海南酒店项目BIM-5D精细化管理研究
1. | 天津理工大学管理学院, 天津 300384 |
2. | 中国建筑第八工程局天津公司,天津 300384 |
Research on BIM-5D Fine Management in Hainan Hotel Project
1. | School of Management, Tianjin University of Technology, Tianjin 300384, China |
2. | Tianjin Company, China Construction 8th Engineering Division, Tianjin 300384, China |
引用本文: 钟炜, 张凯乐, 乜凤亚. 海南酒店项目BIM-5D精细化管理研究[J]. 土木建筑工程信息技术, 2017, 9(2): 24-29. doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.04
Citation: Zhong Wei, Zhang Kaile, Nie Fengya. Research on BIM-5D Fine Management in Hainan Hotel Project[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(2): 24-29. doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.04
摘要:本研究以精细化管理理念为指导,结合国内外大型建设项目中BIM技术在设计阶段和施工阶段的应用,从业主视角深入发掘除碰撞检查、综合布局优化、施工漫游及施工模拟等BIM应用点之外,基于BIM-5D技术在投资管控等关键节点的新型并联工作模式,旨在探索企业基于BIM技术进行流程再造以实现精细化建造在成本管理等方面的创新应用,提高工作流程转化的效率,节约交易成本,为企业新建项目BIM技术的应用提供可参考的实施方案。
Abstract: The research is guided by the concept of fine managementphilosophy.Considering the application of BIM technology in domestic and foreign large-scale construction projects in the design and construction stages, this paper takes the perspective of the owner to explore in depth in addition to collision detection, comprehensive layout optimization, construction and construction simulation for a new parallel operation mode of investment, management and control based on BIM-5D technology in key nodes, additional to existing BIM applications like collision detection, comprehensive layout optimization, construction roaming, construction simulation, etc.This paper also aims at exploring enterprise′s progress reengineering based on BIM for innovative applications in areas like fine construction for cost management, to improve workflow transformation efficiency, as well as to save transaction costs, for providing an implementation reference scheme for the BIM application in new project of the enterprise.
[1] | |
[2] |
张云云. M公司项目管理流程优化研究[D]. 哈尔滨: 哈尔滨工业大学, 2016. |
[3] | |
[4] | |
[5] |
唐海燕, 刘荣桂等.基于BIM-5D的工程施工成本预测系统构建[J].工程管理学报, 2015, 29(4): 107-112. |