Citation: Jing Li, Chenyang Zhao, Hao Yan, Shun Li, Dongyu Bai. Study on Toe Line Calculation and Visualization Based on BIM. Journal of Information Technologyin Civil Engineering and Architecture, 2024, 16(1): 132-137. doi: 10.16670/j.cnki.cn11-5823/tu.2024.01.23
2024, 16(1): 132-137. doi: 10.16670/j.cnki.cn11-5823/tu.2024.01.23
Study on Toe Line Calculation and Visualization Based on BIM
1. | School of infrastructure engineering, Dalian University of Technology, Dalian 116024, China |
2. | Beijing Glory PKPM Technology Co., Ltd., Beijing 100013, China |
3. | Kunming Engineering Co., Ltd., China Electric Power Construction Group, Kunming 650051, China |
One of the commonly used methods for slope treatment in large-scale infrastructure projects such as airports and roads is to directly set slopes based on soil type and a certain slope. Although existing BIM software provides certain functions to meet the needs of toe line calculation and slope earthwork volume estimation, the repeated use of software functions during the parametric design process of airport terrain optimization results in high time costs and low efficiency. To address aforementioned issues, this paper proposes a method for calculating toe lines by establishing mathematical models of the slope and ground, and developing a Civil 3D plug-in using C# to realize automatic visualization generation of toe lines. Compared with the traditional manual drafting methods and existing BIM functionalities, it has the advantages of being suitable for computer solving and having fast calculation speed, which demonstrates high practical value for the projects that involve model generation and solution iteration.
[1] |
杨献波. 基于遗传算法的公路纵断面优化研究[D]. 江苏: 东南大学, 2006. |
[2] |
楼设荣. 机场地势非标准断面优化设计[J]. 空军工程学院学报, 1991, 11(3). |
[3] |
Mayer R H, Stark R M. Earthmoving Logistics[J]. Journal of the Construction Division, 1981, 107(2): 297-312.doi: 10.1061/JCCEAZ.0000963 |
[4] |
Easa S M. Selection of roadway grades that minimize earthwork cost using linear programming[J]. Transportation Research Part A: General, 1988, 22(2): 121-136.doi: 10.1016/0191-2607(88)90024-6 |
[5] |
Easa S M. Earthwork Allocations with Linear Unit Costs[J]. Journal of Construction Engineering and Management, 1988, 114(4): 641-655.doi: 10.1061/(ASCE)0733-9364(1988)114:4(641) |
[6] |
Moreb A A, Bafail A O. A linear programming model combining land levelling and transportation problems[J]. Journal of the Operational Research Society, 1994, 45(12): 1418-1424.doi: 10.1057/jors.1994.218 |
[7] |
王博爽, 邓永煌. 无人机结合BIM的边坡工程三维设计方法研究[J]. 资源环境与工程, 2021, 35(01): 89-92. |
[8] |
邓朗妮, 罗日生, 郭亮, 等. 基于线性规划数学模型算法的土方调配[J]. 土木工程与管理学报, 2018, 35(02): 25-31. |
[9] |
李元光, 楼设荣, 许巍. 机场地势设计[M]. 北京: 人民交通出版社, 2014. |
[10] |
高阳, 李崇贵. 常用平面坐标转换模型的空间适用范围研究[J]. 西安科技大学学报, 2014, 34(1): 81-86. |
[11] |
王子茹, 贾艾晨. 画法几何及工程制图[M]. 北京: 人民交通出版社, 2019. |
[12] |
王磊. AutoCAD Civil 3D. NET二次开发[M]. 上海: 同济大学出版社, 2017. |
Metrics
- PDF Downloads(14)
- Abstract views(758)
- HTML views(474)