Citation: Pan Han, Huang Xiping, Jin Huazhong, Zou Yiquan, Liu Yang. Research on Production Scheduling of PC Component Factory Based on Genetic Algorithm. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(6): 113-118. doi: 10.16670/j.cnki.cn11-5823/tu.2018.06.19
2018, 10(6): 113-118. doi: 10.16670/j.cnki.cn11-5823/tu.2018.06.19
Research on Production Scheduling of PC Component Factory Based on Genetic Algorithm
1. | China Construction Third Engineering Bureau Green Industry Investment Co., Ltd., Wuhan 430074, China |
2. | School of Computer Science, Hubei University of Technology, Wuhan 430068, China |
3. | School of Civil Engineering, Architecture and Environment, Hubei University of Technology, Wuhan 430068, China |
The scale and number of prefabricated buildings are constantly expanding, and the type and number of components are required to increase greatly. However, the current component mass production standardization level is low, digital management level is not high, resulting in component production efficiency low and difficult to achieve the expected production capacity. In this paper, an improved genetic algorithm is proposed for the production scheduling optimization of PC component plant based on the actual situation of production line and the analysis of component scheduling process.
[1] |
靳华中, 邹贻权, 刘阳.面向生产线级的PC构件排产模式研究[J].土木建筑工程信息技术, 2018, 10(4): 88-93. |
[2] |
武韶敏, 胡晓兵, 王江武等.改进遗传算法求解面向订单多目标排产问题[J].机械设计与制造, 2018(3):102-108.doi: 10.3969/j.issn.1001-3997.2018.03.031 |
[3] |
Rom W O, Slotnick S A.Order acceptance using genetic algorithm[J]. Computers & Operations Research, 2009, 36(6):1758-1767. |
[4] |
Siddharth M, Purushothaman D, CHEN C S.A branch and price solution approach for order acceptance and capacity planning in make-to-order operations[J]. European Journal of Operational Research, 2011, 211(3): 480-495.doi: 10.1016/j.ejor.2011.01.002 |
[5] |
祁建, 霍光, 李宣. PC自动化生产线养护工艺及养护系统研究[J].混凝土世界, 2016(5):84-87.doi: 10.3969/j.issn.1674-7011.2016.05.015 |
[6] | |
[7] |
陈韶飞, 李弘, 夏文杰.基于Anylogic的商业银行排队系统仿真研究[J].科技通报, 2016, 32(08):210-214.doi: 10.3969/j.issn.1001-7119.2016.08.048 |
[8] |
Wang H.Flexible flow shop scheduling: optimum, heuristics and artificial intelligence solutions[J]. Expert Systems, 2005, 22(2):78-85.doi: 10.1111/exsy.2005.22.issue-2 |
Metrics
- PDF Downloads(28)
- Abstract views(2641)
- HTML views(840)