2018, 10(5): 46-52. doi: 10.16670/j.cnki.cn11-5823/tu.2018.05.07
上海国际旅游度假区基于BIM的工程竣工规划验收创新研究
上海现代建筑设计集团工程建设咨询有限公司,上海 200041 |
Research on BIM-Based Innovation in Project Completion Planning Acceptance of Shanghai International Tourism Resort
Shanghai Xiandai Engineering Consulting Co., Ltd., Shanghai 200041, China |
引用本文: 陆扬. 上海国际旅游度假区基于BIM的工程竣工规划验收创新研究[J]. 土木建筑工程信息技术, 2018, 10(5): 46-52. doi: 10.16670/j.cnki.cn11-5823/tu.2018.05.07
Citation: Lu Yang. Research on BIM-Based Innovation in Project Completion Planning Acceptance of Shanghai International Tourism Resort[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(5): 46-52. doi: 10.16670/j.cnki.cn11-5823/tu.2018.05.07
摘要:近年来建筑信息模型(BIM)不仅在理论方面有快速发展,而且在项目实践中广泛应用,但是BIM运用于政府技术变革、管理变革的研究与实践还较鲜见。作为上海市重点核心区域以及响应上海市政府在工程建设行业建立基于BIM技术的政府监管模式的相关政策要求,本文介绍了在迪士尼玩具总动员项目中通过BIM技术的应用,提高竣工规划验收的效率和准确性,培养具备BIM能力的政府工作团队,建立新的基于BIM的验收流程和竣工规划验收平台,以及对打造公开、透明、高效的行政审批监管体系,提高政府行政效能起到的积极作用。
Abstract: In recent years, the Building Information Model (BIM) technology not only receives rapid development in aspect of theory, but also has been widely used in the project practice. However, it is rarely seen that the BIM technology is applied to the research and practice of government technological or management revolution. In response to the policy requirements of Shanghai Municipal Government to establish a BIM-based government supervision model in the construction industry, this paper introduces the application of BIM technology in the Disney Toy Story project, which is located in the key core areas of Shanghai. Through the application of BIM technology, the efficiency and accuracy of completion planning acceptance has been improved. Efforts are also made on training the government working team with BIM ability, and on establishing a new BIM-based acceptance process, which plays an active role in building an open, transparent and efficient administrative examination and approval supervision system and improving the administrative efficiency of the government.
[1] |
丁士昭.工程项目管理[M].北京:中国建筑工业出版社, 2006. |
[2] | |
[3] |
颜金彪等.房屋竣工规划验收软件设计与实现[J].城市勘测, 2014(6):126-129.doi: 10.3969/j.issn.1672-8262.2014.06.038 |
[4] |
GSA.The national 3D–4D-BIM program, U.S.General Services Administration—Public Buildings Service.Washington, DC:Office of the Chief Architect, 2006. |
[5] |
National Institute of Building Science(NIBS).National BIM Standard.http://cic.vtt.fi/Projeets/vbe-net/data/BIM_Slide_Show.Pdf, 2008-09-07. |
[6] |
Chuck.Eastman, P.Teicholz, R.Sacks, and K.Liston.BIM Handbook:A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors, NY:John Wiley and Sons, 2008. |
[7] |
王广斌, 张洋, 杨学英等.工程项目建设信息化发展方向—虚拟设计与施工.武汉大学学报工学版[J], 2008, 41 (2):90-94. |
计量
- PDF下载量(29)
- 文章访问量(1897)
- HTML全文浏览量(855)