2021, 13(6): 26-32. doi: 10.16670/j.cnki.cn11-5823/tu.2021.06.05
基于BIM技术的建筑工程设计阶段优化——以某综合实验楼项目为例
1. | 重庆路先峰科技有限公司,重庆 400044 |
2. | 西南政法大学,重庆 401120 |
3. | 重庆市城投公租房建设有限公司,重庆 400015 |
Optimizing the Building Design Based on BIM——A Case Study for the Integrated Laboratory Building
1. | Chongqing Road Pioneer Technology Co., Ltd., Chongqing 400044, China |
2. | Southwest University of Political Science & Law, Chongqing 401120, China |
3. | Chongqing Chengtou Public Rental Housing Construction Co., Ltd., Chongqing 400015, China |
引用本文: 马继国, 张野, 赵刚刚, 刘冒佚. 基于BIM技术的建筑工程设计阶段优化——以某综合实验楼项目为例[J]. 土木建筑工程信息技术, 2021, 13(6): 26-32. doi: 10.16670/j.cnki.cn11-5823/tu.2021.06.05
Citation: Jiguo Ma, Ye Zhang, Ganggang Zhao, Maoyi Liu. Optimizing the Building Design Based on BIM——A Case Study for the Integrated Laboratory Building[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2021, 13(6): 26-32. doi: 10.16670/j.cnki.cn11-5823/tu.2021.06.05
摘要:设计阶段是建筑项目投资和工程质量控制的关键。传统的二维建筑设计中,建筑物的设计成果表现方式主要由平面图、立面图、剖面图、大样图四种基本图纸组合而成,在效果呈现和规避设计碰撞存在先天不足。建筑信息模型(BIM)技术使得三维环境下的协同设计、集成分析成为可能,并且通过三维模型渲染提供了更加直观的实时可交互效果图,从而提高设计质量与沟通效率。本文以西南政法大学综合实验楼项目为例,介绍在设计阶段中利用BIM技术(Revit、Ecotect软件与协同平台等)进行日照分析、冲突分析、合规性检查、多专业协同深化等实践经验,从而积极探究BIM技术在设计阶段深入应用价值。
Abstract: Design stage is the key of controlling the cost and quality of construction projects. In the traditional two-dimensional building design, buildings are expressed mainly by four basic drawings: plan view, elevation view, section view and large sample drawing, which inherently lacks the capability of presenting the design effect and avoiding the collision of different building elements of different disciplines. Building information modeling (BIM)technologies enables collaborative design and integrated analysis in a 3D environment, and provides more intuitive real-time interactive renderings through 3D model rendering, which will improve design quality and communication efficiency. Taking the project of the comprehensive experimental building of Southwest University of Political Science and Law as a case study, this paper introduces the practical experiences of BIM application in design stage, including sunlight analysis, conflict analysis, compliance check, multi-disciplinary collaborative deepening to actively explore the in-depth application value of BIM technology in the design stage.
[1] |
中国建筑学会. BIM应用发展报告(2019). 北京: 中国建筑工业出版社, 2020. |
[2] | |
[3] |
曾旭东, 周鑫, 张磊. BIM技术在建筑设计阶段的正向设计应用探索[J]. 西部人居环境期刊, 2020(11): 155-155. |
[4] |
陈志军, 查书平, 高阳华, 等. 重庆市日照时间变化规律和特征分析[J]. 南通大学学报, 2008(2): 55-59.doi: 10.3969/j.issn.1673-2340.2008.02.014 |
[5] |
GB 50180-2018, 城市居住区规划设计规范[S]. 北京: 中国计划出版社, 2008. |
[6] | |
[7] | |
[8] |
王鸿洋, 徐宁, 冯西培. 北京市轨道交通新线车站卫生间设计标准浅析[J]. 城市建筑, 2018(29): 65-67.doi: 10.3969/j.issn.1673-0232.2018.29.019 |
[9] |
王廷魁, 邓兢兢, 李骁. 基于内容分析法的BIM设计阶段应用研究综述[J]. 建筑经济, 2016(9): 100-105. |
[10] |
计量
- PDF下载量(90)
- 文章访问量(2411)
- HTML全文浏览量(1113)