2015, 7(1): 1-7.
基于BIM技术的智能化住宅部品生产作业计划与控制系统功能需求分析
清华大学,北京 100084 |
Functional Requirements Analysis of BIM Intelligent Scheduling and Control System for Precast Production of Prefabricated Residential Buildings
Tsinghua University, Beijing 100084, China |
引用本文: 马智亮, 杨之恬. 基于BIM技术的智能化住宅部品生产作业计划与控制系统功能需求分析[J]. 土木建筑工程信息技术, 2015, 7(1): 1-7.
Citation: Ma Zhiliang, Yang Zhitian. Functional Requirements Analysis of BIM Intelligent Scheduling and Control System for Precast Production of Prefabricated Residential Buildings[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(1): 1-7.
摘要:本文分析基于BIM技术的智能化住宅部品生产计划与控制系统的功能需求。首先,建立现行住宅部品生产作业计划与控制过程模型;其次,在总结现行管理模式中所存问题的基础上,基于BIM等新信息技术所带来的可能性,提出改进的过程模型;最后,基于所提出的新模型,分析基于BIM技术的智能化住宅部品生产作业计划与控制系统功能需求。依据上述方法,本研究共提出了37项功能需求,为进一步进行系统设计和开发奠定了基础。
Abstract: This paper analyzes the functional requirements of a BIM based intelligent scheduling and control system for precast production of prefabricated residential buildings. First, the current process of scheduling and control of precast production is analyzed and modeled. Then, based on the problems existing in the current process and the latest technologies such as BIM and multi-agent systems, the process is updated and a new process model is established. Finally, the functional requirements of the system are analyzed based on the new process model. Consequently, 37 functional requirements are obtained and presented, which lays the foundation for further development of the system.
[1] |
中华人民共和国国家统计局. 房屋竣工面积和住宅房屋竣工面积(2013年) http://www.stats.gov.cn/,2011[EB/OL]. 中华人民共和国国家统计局网, 2014-9-22. |
[2] |
Benjaoran V, Dawood N. Intelligence approach to production planning system for bespoke precast concrete products[J]. Automation in Construction, 2006, 15(6): 737-745.doi: 10.1016/j.autcon.2005.09.007 |
[3] |
Leu S S, Hwang S T. A GA-based model for maximizing precast plant production under resource constraints[J]. Engineering Optimization, 2001, 33(5): 619-642.doi: 10.1080/03052150108940936 |
[4] |
Ko C H, Wang S F. GA-based decision support systems for precast production planning[J]. Automation in Construction, 2010, 19(7): 907-916.doi: 10.1016/j.autcon.2010.06.004 |
[5] |
Benjaoran V, Dawood N, Hobbs B. Flowshop scheduling model for bespoke precast concrete production planning[J]. Construction Management and Economics, 2005, 23(1): 93-105.doi: 10.1080/0144619042000287732 |
[6] |
Wang L C, Lin S K. A multi-agent based agile manufacturing planning and control system[J]. Computers & Industrial Engineering, 2009, 57(2): 620-640. |
[7] |
Sacks R, Eastman C M, Lee G. Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry[J]. Journal of Construction Engineering and Management, 2004, 130(2): 206-215.doi: 10.1061/(ASCE)0733-9364(2004)130:2(206) |
[8] |
Lee G, Sacks R, Eastman C. Product data modeling using GTPPM—A case study[J]. Automation in Construction, 2007, 16(3): 392-407.doi: 10.1016/j.autcon.2006.05.004 |
[9] |
Lee G, Eastman C M, Sacks R. Eliciting information for product modeling usin g process modeling[J]. Data & Knowledge Engineering, 2007, 62(2): 292-307. |
[10] |
Sacks R, Eastman C M, Lee G. Information and process flow in models of precast concrete design and construction[C] Proceedings of 3rd International Conference on Concurrent Engineering in Construction. 2002. |
[11] |
Sacks R, Eastman C M, Lee G. Generating IFC views and conformance classes using GTPPM[C]. Proceedings of Information and Process Flow In models. 2002, 51-62. |
[12] |
姚小风.工厂生产计划制订与执行精细化管理手册[M].北京:民邮电出版社, 2014. |
[13] |
Nenadč Babič, Peter Podbreznik, Danijel Rebolj. Integrating resource production and construction using BIM[J]. Automation in Construction, 2010, 19(5):539-543.doi: 10.1016/j.autcon.2009.11.005 |
[14] | |
[15] |
Dawood N, Marasini R. Visualisation of a stockyard layout simulator "SimStock": a case study in precast concrete products industry[J]. Automation in Construction, 2003, 12(2): 113-122.doi: 10.1016/S0926-5805(02)00044-4 |
[16] |
Marasini R, Dawood N. A simulation approach to optimize stockyard layout: A case study in precast concrete products industry[J]. Ed Gudnason, G., Construction Information Technology, 2000: 610-619. |
[17] |
Radio-frequency identification[G/OL]. Wikipedia, 2013. http://en.wikipedia.org/wiki/Radio-frequency_identification. |
[18] |
Genetic algorithm[G/OL]. Wikipedia, 2013. http://en.wikipedia.org/wiki/Genetic_algorithm. |
[19] |
Multi-agent system[G/OL]. Wikipedia, 2014. http://en.wikipedia.org/wiki/Multi-agent_system. |
计量
- PDF下载量(16)
- 文章访问量(1288)
- HTML全文浏览量(925)