Citation: Cui Chen, Zhang Lei, Wu Junwei, Li Jun. Design of BIM Platform in Bridge Prefabricated Assembly Construction Management. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(6): 51-54. doi: 10.16670/j.cnki.cn11-5823/tu.2016.06.09
2016, 8(6): 51-54. doi: 10.16670/j.cnki.cn11-5823/tu.2016.06.09
Design of BIM Platform in Bridge Prefabricated Assembly Construction Management
1. | Shanghai SMI Highway(Group)Co., Ltd., Shanghai 200335, China |
2. | Shanghai Municipal Engineering Design Institute(Group)Co., Ltd., Shanghai 200092, China |
Based on one prefabricated assembly ramp project, the BIM platform was developed according to the requirement of owner and construction unit which realized the management of construction schedule, information inquiry of prefabricated element and construction monitoring, as well as the management of project files including drawing files.
[1] | |
[2] | |
[3] |
Metrics
- PDF Downloads(21)
- Abstract views(2345)
- HTML views(663)