Citation: Xiangyu Liu, Ningna Yan, Zhenwei Zhao. Summary of the Research on BIM Application Technology in the Life Cycle of Prefabricated Buildings. Journal of Information Technologyin Civil Engineering and Architecture, 2022, 14(6): 32-37. doi: 10.16670/j.cnki.cn11-5823/tu.2022.06.06

2022, 14(6): 32-37. doi: 10.16670/j.cnki.cn11-5823/tu.2022.06.06

Summary of the Research on BIM Application Technology in the Life Cycle of Prefabricated Buildings

1. 

School of Civil and Water Conservancy Engineering, Ningxia University, Yinchuan 750021, China

2. 

Ningxia Construction Drawings Construction Engineering Technical Review and Consultation Co., Ltd., Yinchuan 750021, China

Corresponding author: 燕宁娜,

Web Publishing Date: 2022-12-01

Fund Project: 国家自然科学基金项目 51968059

[1]

梁桂保, 张友志. 浅谈我国装配式住宅的发展进程[J]. 重庆理工大学学报(自然科学版), 2006, 20(9): 50-52.doi: 10.3969/j.issn.1674-8425-B.2006.09.015

[2]

梁留科, 吴次芳. 住宅产业化——新的经济增长推动力[J]. 经济界, 2003(2): 35-38. 

[3]

戈祥林, 林忠和, 陆仕颖. BIM技术在南宁市规划展示馆的应用[J]. 施工技术, 2013, 42(10): 79-82. 

[4]

曾宪沂, 陶鑫. BIM技术的应用现状和发展趋势[A]. 北京力学会. 北京力学会第二十七届学术年会论文集[C]. 北京力学会: 北京力学会, 2021, 3.

[5]

何清华, 张静. 建筑施工企业BIM应用障碍研究[J]. 施工技术, 2012, 41(22): 80-83. 

[6]

Wilson D G, Smith M H, Deal J. Prefabrication and preassembly: Applying the techniques to building engineering services[Mbuilding Services Research and Information Association, 1998.

[7]

Kirkham R J. Probability distributions of facilities management costs for whole life cycle costing in acute care NHS hospital buildings[J]. Construction Management & Economics, 2002, 20(3): 251-261. 

[8]

Chau K W, Anson M and Zhang JP. Four-dimensional visualization of construction scheduling and site utilization[J]. Constr. Eng. Manage, 2004, (4): 598-606. 

[9]

Wu S, Croome D, Fairey V, et al. Reliability in the whole life cycle of building systems[J]. Engineering Construction & Architectural Management, 2006, 13(13): 136-153. 

[10]

Staub-French S, Russell A, ran N. Linear Scheduling and 4D Visualization[J]. Journal of Computing m Civil Engineering, 2008, 22(3): 192-205.doi: 10.1061/(ASCE)0887-3801(2008)22:3(192)

[11]

Hamid H, Burcm B. A research outlook for real-time information management by integrating advanced field data acquisition systems and building information. modelmg[J]. Journal of Construction Engineering and Management, 2009, 122(3): 111-129.

[12]

Amir H. Behzadan, Asif Iqbal, Vmeet R. Kamat. A collaborative augmented reality based modeling environment fbr construction engineering and management education[C]. Proceedmgs-Wmter Simulation Conference, 2011, 3568-3576.

[13]

Dong-Yuel C, Eun-Young A, Jae-Won K. Understanding and Implementation of the Digital Design Modules for HANOK[J]. Multimedia, Computer Graphics and Broadcasting, 2011, 262: 127-134. 

[14]

Kahn S, Olbrich M, Engelke e, et al. Beyond 3D "As-Built" Information UsmgMobile AR Enhancing the Building Lifecycle Management[J]. IEEE Xplore, 2012.

[15]

Kirkham R J. Probability distributions of facilities management costs for whole life cycle costing in acute care NHS hospital buildings[J]. Construction Management & Economics, 2002, 20(3): 251-261. 

[16]

Zeynalian M, Trigunarsyah B and Ronagh H R. Modification of Advanced Programmatic Risk Analysis and Management Model for the Whole Project Life Cycle's Risks[J]. Journal of Construction Engineering & Management, 2013, 139(1): 51-59. 

[17]

Park S, Kim I. BIM-Based quality control for safety issues in the design and construction phases[J]. Archnet-IJAR, 2015, 3(11): 111-129.

[18]

Al-Ghamdi S G and Bilec M M. Green Building Rating Systems and Whole-Building Life Cycle Assessment: Comparative Study of the Existing Assessment Tools[J]. Journal of Architectural Engineering, 2017, 23(1): 1-9. 

[19]

孙少楠, 孙冰冰, 吴家伟. 基于BIM技术的装配式混凝土建筑设计阶段协同度评估[J]. 人民长江, 2020, 51(4): 218-225.

[20]

姚远. BIM协同设计的现状[J]. 四川建材, 2011, 37(1): 193-194. 

[21]

周坤伦, 李亚爽. BIM技术在建筑设计阶段的应用分析[J]. 风景名胜, 2019(10): 169. 

[22]

李金龙. BIM技术在装配式混凝土建筑设计中的研究与实践应用[J]. 建材与装饰, 2018(46): 86. 

[23]

常治国. 基于H维实体模型的钢结构工业厂房CAD/CAM软件后处理系统[J]. 计算机辅助工程, 2012(4): 56-59. 

[24]

王兰芝, 郄泽. 装配式混凝土建筑施工BIM仿真模拟[J]. 中国住宅设施, 2015(3): 81-83.

[25]

阴云芳. 试析BIM技术在装配式混凝土结构工程中的应用[J]. 建材与装饰, 2019, (31): 12-13. 

[26]

朱维香. BIM技术在装配式混凝土建筑中的应用研究[J]. 山西建筑, 2016, 042(14): 227-228. 

[27]

龙莉波, 马跃强, 赵波, 等. 预制装配式混凝土建筑施工技术及其配套装备的创新研究[J]. 建筑施工, 2016, 38(3): 367-369.

[28]

赵彬, 王友群, 牛博生. 基于BIM的4D虚巧建造技术在工程项目进度管理中的应用[J]. 建筑经济, 2011(9): 93-95. 

[29]

汪再军, 周迎. 基于BIM的建设工程竣工数字化交付研究[J]. 土木建筑工程信息技术, 2021, 13(4): 13-22. 

[30]

赵志华. 基于装配式建筑BIM模型的建筑设计方法与分析[J]. 建筑工程技术与设计, 2019, (17): 1396. 

[31]

巩艳红. BIM技术在装配式混凝土建筑中的应用价值探讨[J]. 城市建筑, 2017(6): 224-224. 

[32]

王信信, 金坚强, 周慧. BIM技术在装配式混凝土建筑运维阶段的应用[J]. 建筑与文化, 2020(1): 178-179.

[33]

李豪杰. BIM技术在建筑全过程阶段应用分析[J]. 中国住宅设施, 2019(10): 78-79. 

[34]

白庶, 张艳坤, 韩凤, 等. BIM技术在装配式混凝土建筑中的应用价值分析[J]. 建筑经济, 2015, 36(11): 106-109.

[35]

朱颖. 基于BIM技术的装配式混凝土建筑建造阶段成本管理研究[D]. 内蒙古科技大学, 2019.

[36]

陆婉婷. 珠三角高层住宅核心筒设计研究[D]. 广州: 华南理工大学, 2009.

[37]

华元璞. 基于BIM的装配式建筑造价精益控制研究[D]. 郑州航空工业管理学院, 2020.

[38]

张璐薇, 关瑞明. BIM技术发展及其建筑设计应用[J]. 华中建筑, 2016(11): 52-57. 

[39]

满吉芳. BIM技术在装配式建筑中的应用研究——以火神山、雷神山项目为例[J]. 重庆建筑, 2021, 20(1): 21-23. 

Metrics
  • PDF Downloads(52)
  • Abstract views(2739)
  • HTML views(961)
Catalog

Figures And Tables

Summary of the Research on BIM Application Technology in the Life Cycle of Prefabricated Buildings

Xiangyu Liu, Ningna Yan, Zhenwei Zhao

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn