2017, 9(5): 98-102. doi: 10.16670/j.cnki.cn11-5823/tu.2017.05.18
变电站工程施工管理中的BIM应用与实践-以泰州文东高山220KV变电站为例
1. | 南京市第六建筑安装工程有限公司,南京 211304 |
2. | 江苏省宏源电力建设监理有限公司, 南京 210000 |
Application of BIM Technology in Transformer Substation Engineering Construction Management-Taking Taizhou 220 kV Substation Construction Project as Example
1. | Nanjing Sixth Construction and Installation Engineering Co., Ltd., Nanjing 211304, China |
2. | Jiangsu Hongyuan Electric Power Construction Supervision Co., Ltd., Nanjing 210002, China |
引用本文: 陈海涛, 陈国兵, 朱志坚. 变电站工程施工管理中的BIM应用与实践-以泰州文东高山220KV变电站为例[J]. 土木建筑工程信息技术, 2017, 9(5): 98-102. doi: 10.16670/j.cnki.cn11-5823/tu.2017.05.18
Citation: Chen Haitao, Chen Guobin, Zhu Zhijian. Application of BIM Technology in Transformer Substation Engineering Construction Management-Taking Taizhou 220 kV Substation Construction Project as Example[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(5): 98-102. doi: 10.16670/j.cnki.cn11-5823/tu.2017.05.18
摘要:变电站是电网工程的重要组成部分,对社会民生和生产有巨大的影响。虽然变电站的建筑结构本身相对比较简单规整,但是相关设备种类繁多,线路布置相对复杂,施工难度也较大。在项目施工过程中难免会出现考虑不全面、现场返工浪费和进度滞后的情况。建筑信息模型技术在工程施工管理中的应用,是解决上述问题的途径之一,文章以泰州文东高山220KV变电站工程为例,展开相关实践工作。
Abstract: The transformer substationis an important componentin the power grid project, which greatly impacts the social people's livelihood and production.The structure of the substation itself is relatively simple and regular, but with various kinds ofrelated equipment and complex circuit layout, theconstruction of substation also faces some difficulties. Inevitably, there will be some incomplete design considerations, on-site rework wastes, and progress laggings. The application of building information model technology in engineering construction management is one of the approaches to solve the above problems. This paper takes the Wendonghigh mountain 220KV substation project in Taizhou as an example, to illustrate the relative works with BIM application.
[1] |
Autodesk.Autodesk white paper:Improving Building Industry Results through Integrated Project Delivery and Building Information Modeling.http://images.autodesk.com/adsk/files/bim_and_ipd_whitepaper.pdf, 2009-04-15. |
[2] |
丁士昭等.建设工程项目管理.北京:中国建筑工业出版社, 2011. |
[3] |
GSA.The national 3D-4D-BIM program, U.S.General Services Administration-Public Buildings Service.Washington, DC:Office of the Chief Architect, 2006. |
[4] |
National Institute of Building Science(NIBS).National BIM Standard.http://cic.vtt.fi/Projeets/vbe-net/data/BIM_Slide_Show.Pdf, 2008-09-07. |
[5] |
Chuck.Eastman, P.Teicholz, R.Sacks, and K.Liston.BIM Handbook:A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors, NY:John Wiley and Sons, 2008. |
计量
- PDF下载量(21)
- 文章访问量(1560)
- HTML全文浏览量(703)