武汉地区淤泥质软土地铁车站深基坑开挖风险控制
1. | 武汉地铁集团有限公司 武汉 430000 |
2. | 华中科技大学 工程管理研究所 武汉 430074 |
Risk Control of Ultra-deep Metro Station Pit Excavationin Wuhan Soft Soil Area
1. | Wuhan Metro Group Co., Ltd., Wuhan 430000, China |
2. | Project Management Institute, Huazhong University of Science and Technology, Wuhan 430074, China |
引用本文: 叶万敏, 卢雄, 张绍辉, 刘宝林. 武汉地区淤泥质软土地铁车站深基坑开挖风险控制[J]. 土木建筑工程信息技术, 2015, 7(3): 97-103.
Citation: Ye Wanmin, Lu Xiong, Zhang Shaohui, Liu Baolin. Risk Control of Ultra-deep Metro Station Pit Excavationin Wuhan Soft Soil Area[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2015, 7(3): 97-103.
摘要:本文以武汉地铁七号线长丰站为例,通过事故树理论分析得出超深基坑开挖过程中存在接缝漏水、纵坡失稳、基坑变形、涌水涌砂、周围地表沉降、基坑基底隆起等风险。针对性的对长丰站5月份超深基坑开挖过程中的地连墙墙体测斜、土体沉降、立柱沉降等监测数据进行分析,分析结果表明地连墙倾斜过大、立柱沉降、地连墙渗漏等是基坑变形过大的征兆,也是超深基坑开挖过程中常见风险,因此需要通过采取及时架设钢支撑、放坡开挖、加强监测、及时降水等措施进行控制。通过及时的安全预警及采取针对性措施使得长丰站基坑开挖风险得到了有效地控制,长丰站主体结构得以顺利完工。通过对长丰站基坑开挖风险的成功预警与控制,以期为武汉地区淤泥质软土超深基坑开挖风险控制提供建议。
Abstract: Taking Changfeng station of Wuhan Metro Line Ⅶ as an example, this article shows that the process of ultra-deep excavation have many risks by theoretical analysis of Fault Tree, such as leaking joints, longitudinal instability, pit deformation, gushing water and sand, surface subsidence around the base hang basement uplift and so on. The article analyses the monitoring data during the excavation of Changfeng station in May including the inclinometer of underground continuous wall, soil subsidence, post settlement and so on. The analysis results show that large underground continuous wall inclinometer, upright settlement, underground continuous wall seepage etc. are the signs of large pit deformation, as well as common risks of ultra-deep excavation process. So we should erect steel braces timely, grading excavation, strengthen monitoring and provide rainfall timely to control them. By timely warning and taking appropriate security measures, the excavation pit risk of Changfeng station was controlled effectively, and the main structure of Changfeng station was completed successful. The success of early warning and control of Changfeng station excavation risks can provide recommendations for the Wuhan soft soil excavation.
[1] |
徐杨青, 朱小敏.长江中下游一级阶地地层结构特征及深基坑变形破坏模式分析[J].岩土工程学报, 2006(S1): 1794-1798. |
[2] | |
[3] |
仲景冰, 李惠强, 吴静.工程失败的路径及风险源因素的FTA分析方法[J].华中科技大学学报(城市科学版), 2003(01):14-17.doi: 10.3969/j.issn.2095-0985.2003.01.004 |
[4] |
R. Sturk, L. Olsson and J. Johansson. Risk and Decision Analysis for Large Underground Projects, as Applied to the Stockholm Ring Road Tunnels[J]. Tunneling and Underground Space technology, 1996, 11(2): 157-164. |
[5] |
J.J.Reilly. The Management Process for Complex Underground and Tunneling Projects[J]. Tunneling and Underground Space Technology, 2000, 31-44. |
[6] |
H. H. Einstein. Risk and Risk Analysis in Rock Engineering[J]. Risk Analysis in Tunnelling, (58I): 239-253. |
[7] |
沈鑫国, 胡俊, 曹东辉.南京地铁过江隧道中间风井施工监测分析[J].施工技术, 2014(07):98-102+121. |
[8] |
钱建仁, 黄捷, 吴盛, 刘壮志.郑州地铁车站超深基坑施工风险管理与控制[J].华北水利水电学院学报, 2011(03):86-89. |
[9] |
马险峰.软土地区超深基坑变形特性离心模型试验研究[J].岩土工程学报, 2009(09):1371-1377.doi: 10.3321/j.issn:1000-4548.2009.09.008 |
[10] |
张若霖. 上海软土超深基坑地表沉降特性的统计分析[J]. 地下工程与隧道, 2013(01): 7-10+15+56. |
计量
- PDF下载量(11)
- 文章访问量(1228)
- HTML全文浏览量(688)