Citation: Gong Zuping, Rui Mingzhuo, Li Xiang, Gong Xuhua, Liu Mingguo, Jiang Xiaofeng, Li Lishu. Analysis on Mechanical Performance of Modular Self-Insulated Prefabricated Concrete Shear Wall. Journal of Information Technologyin Civil Engineering and Architecture, 2019, 11(6): 105-112. doi: 10.16670/j.cnki.cn11-5823/tu.2019.06.17
2019, 11(6): 105-112. doi: 10.16670/j.cnki.cn11-5823/tu.2019.06.17
Analysis on Mechanical Performance of Modular Self-Insulated Prefabricated Concrete Shear Wall
1. | Nantong Lianlong Fabricated Architectural Technology Co., Ltd., Haimen 216100, China |
2. | East China Architectural Design & Research Institute Co., Ltd., Shanghai 200002, China |
3. | Tongji University, Shanghai 200092, China |
Based on the existing problems in project practice, such as the difficulty in controlling the quality of rebar splicing by grout-filled coupling sleeve, the modular self-insulated concrete shear wall structure system was innovatively proposed.Through the pseudo-static test in-plane of 9 pieces of shear wall and the pseudo-static test of 2 coupling beams, the cooperative performance of multiple spliced shear wall and the seismic performance of assembled self-insulated shear wall and coupling beam were studied, the calculation formula of flexural capacity of self-insulated shear wall and coupling beam was verified.The test results indicated that the multiple spliced shear wall has good cooperative performance. Under the medium axial pressure ratio, the self-insulated shear wall has good seismic performance. The flexural capacity and displacement ductility ratio of the self-insulated beam are similar to the solid beam.At the same time, some suggestions on improving the ductility of self-insulated shear wall under high axial pressure ratio are put forward.The related results can provide the basis for the application of the structure system.
[1] |
JGJ 1-2014装配式混凝土结构技术规程[S].北京: 中国建筑工业出版社, 2014. |
[2] |
同济大学建筑工程系.装配式自保温墙板抗震性能试验研究报告[R].上海, 2018. |
[3] |
龚祖平, 董年才, 芮明倬, 等.新型模块化自保温混凝土剪力墙抗震性能试验研究[J].土木建筑工程信息技术, 2019, 11(3): 104-116. |
[4] |
GB 50011-2010建筑抗震设计规范[S].北京: 中国建筑工业出版社, 2010. |
[5] |
吕文, 钱稼茹, 方鄂华.钢筋混凝土剪力墙延性的试验和计算[J].清华大学学报(自然科学版), 1999, 39(4): 25-34.doi: 10.3321/j.issn:1000-0054.1999.04.007 |
[6] |
张国军, 吕西林, 刘伯权, 等.钢筋混凝土框架柱在轴压比超限时抗震性能的研究[J].土木工程学报, 2006, 39(3): 47-54.doi: 10.3321/j.issn:1000-131X.2006.03.007 |
[7] |
李宏男, 李兵.钢筋混凝土剪力墙抗震恢复力模型及试验研究[J].建筑结构学报, 2004, 25(5): 35-42.doi: 10.3321/j.issn:1000-6869.2004.05.006 |
[8] |
沈聚敏, 刘竹青, 翁义军.钢筋混凝土空心柱抗震性能的试验研究[J].建筑结构学报, 1982, 05:35-42. |
[9] |
GB 50010-2010混凝土结构设计规范[S].北京: 中国建筑工业出版社, 2010. |
[10] |
Q/320684 LL003-2018模块化装配整体式剪力墙结构体系应用技术规程[R].南通, 2018. |