2014, 6(3): 50-54.
多条重叠与近间距盾构隧道施工控制及效果分析
1. | 华中科技大学土木学院工程管理研究所,武汉 430074 |
2. | 武汉地铁集团,武汉430030 |
Control Method and Effect Analysis of Construction of Overlapping Tunnels with Short-distance
1. | School of Civil Engineering & Mechanics, Huazhong University of Science & Technology, Wuhan 430074, China |
2. | Wuhan Metro Group Co., Ltd., Wuhan 430030, China |
引用本文: 杨俊, 曾铁梅. 多条重叠与近间距盾构隧道施工控制及效果分析[J]. 土木建筑工程信息技术, 2014, 6(3): 50-54.
Citation: Yang Jun, Zeng Tiemei. Control Method and Effect Analysis of Construction of Overlapping Tunnels with Short-distance[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(3): 50-54.
摘要:本文以武汉地铁二号线及四号线洪中区间隧道为背景,针对多条重叠隧道小间距的特点,提出盾构隧道“先下后上”的总体施工原则,重点阐述了盾构掘进控制、夹层土注浆加固和洞内临时支撑隧道加固等关键措施,通过监测结果有效验证了其成功,可为今后的重叠隧道设计、施工管理提供经验借鉴。
Abstract: Based on overlapping tunnel section from Hongshan Square Station to Zhongnan Road Station of Line No.2 and Line No.4 of Wuhan Metro, this paper proposed a principle of "finish the following part first" for subway construction considering the features of overlapping tunnels with short-distance. It mainly elaborated several key measures, such as shield tunneling control, grouting for mezzanine soil, temporary support in tunnels. Then the monitoring results proved the feasibility of the measures, so that this paper can provide reliable experience for the designation of overlapping tunnels and construction management in the following years.
[1] | |
[2] |
扈森等.地铁重叠隧道设计与施工关键技术研究[M].成都:中铁二院工程集团有限公司, 2007. |
[3] | |
[4] | |
[5] | |
[6] |
仇文革. 地下工程近接施工力学原理与对策研究[D]. 成都: 西南交通大学土木工程学院, 2003. |
[7] |
石山.上下重叠盾构隧道管片内力数值计算分析[J].铁道标准设计, 2009(9):19-22. |
[8] |
郭晨. 近距离重叠盾构隧道施工影响的数值模拟[D]. 成都: 西南交通大学土木工程学院, 2009. |
计量
- PDF下载量(10)
- 文章访问量(1030)
- HTML全文浏览量(669)