2018, 10(2): 111-116. doi: 10.16670/j.cnki.cn11-5823/tu.2018.02.22
基于灰色理论的建筑基坑造价风险预测研究
上海久宁建筑工程有限公司,上海 200061 |
Study on Cost Risk Prediction of Deep Foundation Pit based on the Grey Theory
Shanghai Jiu Ning Construction Engineering Co., Ltd., Shanghai 200061, China |
引用本文: 郭海霞. 基于灰色理论的建筑基坑造价风险预测研究[J]. 土木建筑工程信息技术, 2018, 10(2): 111-116. doi: 10.16670/j.cnki.cn11-5823/tu.2018.02.22
Citation: Guo Haixia. Study on Cost Risk Prediction of Deep Foundation Pit based on the Grey Theory[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(2): 111-116. doi: 10.16670/j.cnki.cn11-5823/tu.2018.02.22
摘要:由于基坑设计理论还不够全面、地表地层的变异以及众多不可预计的复杂问题的出现,施工过程中深基坑工程的造价风险具有多种不确定性。基于多层次灰色理论,针对建筑基坑工程施工阶段的造价风险预测,结合考虑预测指标的关联性,对施工阶段基坑工程造价风险管理评价预测进行详细研究,依托上海某深基坑工程,对其基坑工程施工阶段造价风险进行多层次评价预测,并给出相应风险控制方法,研究成果更好地为建筑基坑工程造价风险预测评价提供理论指导。
Abstract: Because of the uncomprehensive design theory of foundation pit, the variation of surface strata, and the emergence of many other unexpected problems, there are many uncertainties causing the cost risk of deep foundation pit construction. Based on the multi-level grey theory, this paper predicts the cost risk during the construction phase of building foundation pit engineering. Considering the correlated indexes, the evaluation and prediction of cost risk management of foundation pit engineering during the construction phase are studied in details. By using a case study of a certain foundation pit engineering project in Shanghai, the cost risk during the construction stage of foundation pit is evaluated and predicted from multi levels, with corresponding control methods given. The research results can provide theoretical guidance for the prediction and evaluation of the cost risk of building foundation pit engineering.
[1] |
艾鸿涛. 临近地铁隧道的深基坑开挖分析[D]. 上海: 同济大学, 2008. |
[2] | |
[3] |
耿进柱, 赵永光, 张海荣.特大基坑工程平面分区法施工中的群坑换撑技术[J].建筑施工, 2009, 31(9): 744-755. |
[4] |
Tao L, Liu G B, Shi S Y.Displacement of subway tunnels induced by above foundation pit reinforcement[J].Journal of Harbin Institute of Technology, 2009, 41(2): 141-144. |
[5] |
赵永光, 耿进柱, 赵永波.群坑开挖耦合效应及其对周边环境影响的数值分析[J].建筑施工, 2009, 31: 177-180.doi: 10.3969/j.issn.1004-1001.2009.03.007 |
[6] |
赵菊梅.地铁及建筑群环绕中的城市地下交通枢纽基坑方案的设计与决策[J].建筑施工, 2009, 31(11): 968-969.doi: 10.3969/j.issn.1004-1001.2009.11.016 |
[7] | |
[8] | |
[9] |
Al-Momani A.H.Construction delay: a quantitative analysis.International Journal of Project Management, 2000, 18: 51-59.doi: 10.1016/S0263-7863(98)00060-X |
[10] |
Nasir D., MvCabe B., Hartono L.Evaluating risk in construction-schedule model(ERIC-S): construction schedule risk model[J].Journal of Construction Engineering and Management, 2003, 129(5): 518-527.doi: 10.1061/(ASCE)0733-9364(2003)129:5(518) |
[11] |
计量
- PDF下载量(29)
- 文章访问量(2078)
- HTML全文浏览量(930)