Citation: Zhong Wei, Jiang Tengteng. Collaborative Construction based on BIM Standard. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(5): 95-101.
2014, 6(5): 95-101.
Collaborative Construction based on BIM Standard
Tianjin University of Technology, Tianjin 300384, China |
"Information Isolated Island" phenomenon is restricting the construction industry life cycle management efficiency, and the participating parties are reluctant to share information, which often leads to the emergence of a large number of changes in construction.Based on the unified standard of BIM, the information of all the participants in investment, design, construction, completion stage is created and transmitted in strict accordance with the unified BIM standard, avoiding the information flow distortion during transmission.Firstly, breaking the traditional narrow understanding of BIM, its location in the broad sense as a mechanism raises and establishs BIM standards based on IFC standard in this mechanism.Secondly, the introduction of the system entropy value indicates the degree of order to establish the full life cycle of information transmission architecture model based on entropy and information technology.Finally, on the basis of BIM standards and information transmission model, a building life-cycle collaborative framework is proposed, in order to reduce post-construction changes, which provides a basis for solving the whole process of building "Information Isolated Island" phenomenon.
[1] |
National Institute of Standards and Technology. [2009-4-13]. http://www.nist.gov |
[2] |
梅苏良, 周与淳, 等.中国BIM协同设计的现状分析[J].科技创新导报, 2012(28):4-5.doi: 10.3969/j.issn.1674-098X.2012.28.003 |
[3] |
曾统华. 基于BIM技术的建筑节能设计软件研制及应用[D]. 北京: 清华大学, 2012. |
[4] |
何清华, 钱丽丽, 段运峰, 李永奎, 等.BIM在国内外应用的现状及障碍研究[J].工程管理学报, 2012, 26(1):12-16. |
[5] |
满庆鹏, 李晓东, 等.基于普适计算和BIM的协同施工方法研究[J].土木工程学报, 2012, 45(S2):311-315. |
[6] |
张建平, 李丁, 林佳瑞, 颜钢文, 等.BIM在工程施工中的应用[J].施工技术, 2012, 41(371):10-17. |
[7] |
王广斌, 张洋, 姜阵剑, 张俊生, 等.建筑项目施工前各阶段BIM应用方受益情况研究[J].山东建筑大学学报, 2009, 24(5):438-459. |
[8] |
孙悦. 基于BIM的建设项目全生命周期信息管理研究[D]. 哈尔滨: 哈尔滨工业大学, 2011. |
[9] |
杨科, 车传波, 徐鹏, 康登泽, 等.基于BIM的多专业协同设计探索系列研究之一:多专业协同设计的目的及工作方法[J].四川建筑科学研究, 2013, 39(2):394-397. |
[10] |
IFC2x Edition 3 final. http://www.iai-international.org |
[11] |
Chotchai C, Wijittra M, et al.Collaborative Negotiation Behaviors in Thai Construction Projects[J].American Society of Civil Engineers, ASCE, 2011, 3:109-115. |
Metrics
- PDF Downloads(9)
- Abstract views(1375)
- HTML views(772)