• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Quantitative Study on Benefit of BIM Application Project Based on System Dynamics
Rao Pingping, Zhu Qing′e, Lin Yihao, Wang Xiangyu, Wang Xichun, Tang Hao, Guo Chenzhi, Xing Fengchao
2020,12(1):8-15. doi: 10.16670/j.cnki.cn11-5823/tu.2020.01.02
The system theory is applied to construct the BIM application project system project. Through the analysis of relationship among different variables, the stock flow graph is drawn to simulate and measure the economic benefits of BIM application in projects. The Vensim software is applied to draw the inventory flow graph and to test the model. According to the analysis on actual application of the project, the project data is extracted, and the Vensim software is applied to conduct simulation to obtain the benefit of BIM application in projects with more reasonable calculation process and more accurate calculation result. Influencing factors, including engineering cost, engineering error rate, engineering rework rate, working hours, working intensity, fatigue, management assistance, and etc., are all selected to compare and analyze the data of projects without applying BIM technology, and to analyze the impact of projects with BIM application, verifying the rationality and feasibility of the model.
key words: BIM Application, Stock Flow Graph, Benefit, Simulation, System Dynamics
Research on Performance Evaluation Method of Engineering Projects Based on BIM Technology
Lin Yihao, Xu Ming, Rao Pingping, Xiang Jiangfan, Wang Xiangyu, Wang Xichu
2019,11(3):50-54. doi: 10.16670/j.cnki.cn11-5823/tu.2019.03.09
As a newly emerged technology, the BIM technology still possesses many uncertain factors or uncertain trends in the future. Under the background of BIM application in the whole industry, it is generally believed in the whole industry that BIM technology can bring higher economic value, which, however, lacks of strong support of evaluation system. Based on the characteristics of BIM technology, this paper determines the performance evaluation index through integrated methods of questionnaire survey and literature induction, and also establishes a performance evaluation system of engineering projects of BIM technology by using the analytic hierarchy process and fuzzy comprehensive evaluation. The established BIM project performance evaluation system is then applied in a BIM pilot project which has completed acceptance to conclude comprehensive evaluations of the performance of the project.
key words: Analytic Hierarchy Process, Project Performance, BIM Technology, Fuzzy Evaluation

Year of publication

Related authors

Related hot words

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn