2012,4(2):43-47.
According to the study of the underlying data content and manifestation of construction e-government field, at the point of view on the management requirements of the whole industry, the author filtered necessary basic data reasonably、classified data based on certain rules and drew up E-government Base Data Standards of Building Industry.The standards guarantee the correctness of the data exchange in different levels and environments and provide the necessary data base security for the information construction of building industry.
2011,3(2):26-32,36.
Combining with model-driven (MDA) technical characteristics and business process management (BPM) concepts, research and implementation of the system platform, which was used to meet the current needs of multi-participant project management for survey and design enterprises, was presented. Firstly, a system framework and implementation strategies based on BPM was proposed, which focuses on the XML-based model-driven implementation process and technical characteristics; Secondly, the software system of multi-participant project management for Survey and Design Enterprises has been accomplished, taking into account the actual needs of the project management; Finally, the core business modules and business characteristics of the system were described.
2010,2(2):46-49.
According to the management mode of large-scale industrial design institute and the application requirement of CCCC Highway Consultants CO., Ltd., a general management system for large-scale industrial design institute was developed, which adopted the advanced SOA architecture. This system was used in the work of CCCC Highway Consultants Co., Ltd., The paper introduces the developing process and implement of this system, which can be referenced by industrial design institutes.