Risk Control Analysis of Metro Entrance /Exit Tunnel Constructed by Pipe Jacking Method in Wuhan
Niu Feng, Su Yuan, Zhou Xiangyu, Yang Jun
2015,7(2):89-96.
According to practical construction case of No.3 and No. 4 entrance / exit tunnel of Zongguan station in the 1st phase of Wuhan Metro Line 3, this paper gives a comprehensive analysis of all kinds of possible emerging risks in the construction process combining the practical monitoring data. Considering that the pipe jacking construction technology has not been widely used in soft soil area like Wuhan, and the constructors lack experience of pipe jacking construction, it would be necessary to the all construction process if related personnel take some actions to prevent and control the existing risk problems in the construction technology. Meanwhile, it could also offer the valuable experiences to similar projects in the future. Through analyzing the process of pipe jacking and practical monitoring data in No. 4 entrance / exit tunnel of Zongguan station, we could draw the following conclusions : (1) Laying the monitoring points in different places of the construction site could effectively avoid the occurrence of risk; (2) During the construction process of No. 4 entrance / exit tunnel, the ground settlement is much larger than the surrounding buildings settlement, the maximum could reach 58.58 mm, and it would gradually increase with the advance of pipe jacking. (3) The settlement of the bridge pier around the tunnel constructed by Rectangular Pipe Jacking Method is very small. The settlement of the bridge pier is far less than 2mm, and the settlement value keeps stable in general.
key words: Rectangular Pipe Jacking, Entrance/Exit Tunnel of Metro, Monitoring During Construction, Risk Control
Analysis on the Application Problems of BIM Technology based on Revit in Structural Design
Yang Danghui, Su Yuan, Sun Ming
2014,6(3):13-18.
Data exchange between structural analysis software and structural modeling using BIM tools has been a key problem in terms of the application of BIM technology in structural design. This paper discusses the current state-of-the-art of the advantages and disadvantages on data exchange issues from the aspects of IFC standard, Revit API Platform and Excel data format, and then the theoretical analysis is conducted after the test. The test results show that IFC standard is only suitable for the information exchange of structural physical model, and the sequential structural analysis and reinforcement entity configuration receives very huge restriction; the information exchange interface based on Revit API is feasible in structural analysis and design, however, there are many problems such as the instability of the interface to be solved and the method based on excel file format is stable during the data exchange process, however, it depends on whether the software can export and import excel file. Finally, different data exchange strategies should be adopted according to the type of the structural system and the complexity of the model.
key words: Building Information Modeling, IFC, Revit API, Data Exchange

Year of publication

Related authors

Related hot words

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn