• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Indoor Natural Wind Ventilation Simulation Practice based on BIM Workflows——An Example of Zhoujiadu 01-07 Project
Zhang Xing, Wang Kai, Wang Hailong, Zhu Qingtao
2016,8(4):46-49. doi: 10.16670/j.cnki.cn11-5823/tu.2016.04.08
With the practice of indoor natural ventilation simulation in Zhoujiadu 01-07 Project, The author summerizes the disadvantages of present green building design method and puts forward new green design workflows based on BIM.
key words: Green Building Design, Indoor Natural Wind Ventilation Simulation, BIM
Research and Application of BIM Technology in Assembly Building——An Example of Cai Hong Wan Project
Li Zhuo, Yu Kan, Long Lixia, Wang Hailong, Peng Jie
2016,8(4):33-39. doi: 10.16670/j.cnki.cn11-5823/tu.2016.04.06
Construction industrialization uses modern industrial production methods to design and construct buildings.As a new construction technology, BIM technology can realize the informatization construction of the project, and by means of visualization and virtual simulation, it realizes the transparency throughout the whole process of the project and increases the controlling ability over the participants so as to prevent risks.Based on the characteristics of the assembly building application and Cai HongWan project, this article studies the application of BIM technology during the whole process of assembly building design, component processing, construction and maintenance.
key words: Industrialization, Prefabricated, BIM Technology, Information Integration

Year of publication

Related authors

Related hot words

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn