Abstract:
Considering the complexity and difficulty of the construction of the truss layer surrounding the super high-rise core tube structure, this paper proposes a method applying the BIM technology to establish models for conducting collision analysis, schedule analysis, hoisting and jacking analysis, and etc., and for deducing the whole construction process. According to the results of analysis, corresponding deepening design are adjusted, to better arrange reasonable construction process and make disclosure. The method effectively solves the difficulties in the construction of truss layer surrounding core tube structure, guarantees the smooth construction and creates certain economic benefits.