• ISSN: 1674-7461
  • CN: 11-5823/TU
  • 主管:中国科学技术协会
  • 主办:中国图学学会
  • 承办:中国建筑科学研究院有限公司

京哈高速陶赖昭特大桥改扩建工程BIM技术应用

Application of BIM Technology in Reconstruction and Extension Project of Taolaizhao Super-Grand Bridge in Beijing-Harbin Expressway

  • 摘要: 陶赖昭特大桥位于北京至哈尔滨高速公路长春至拉林河段,其改扩建工程存在着自然条件复杂,跨江工程勘测外业难度大,交通组织方式难以呈现,施工困难较多等问题。为了更好地解决施工进度质量,通过集成多个BIM软件分别对该项目勘测、规划、设计、施工、运维等阶段的开发进行了探索,为今后更好地实现BIM技术在改扩建工程中的三维协同集成应用和指标优化夯实基础。

     

    Abstract: The Taolaizhao super-grand bridge is located at the Changchun-Lalin River Section of the Beijing-Harbin Expressway. The reconstruction and extension project of this bridge faces many difficulties including complex surrounding natural conditions, rough fieldwork survey in cross-river environments, difficult presentation on the traffic organization, and many other challenges in construction. To better promote the construction schedule and the construction quality, this paper investigates the development of many phases includingsurvey, planning, design, construction, operation and maintenance by integrating several BIM software, which has established a consolidate foundationfor the future 3D integrated and coordinated application of the BIM technology, as well as the index optimization, in the reconstruction and extension project.

     

/

返回文章
返回