Abstract:
The terrain of the project is complex and the transportation of personnel, materials and machinery is inconvenient. There are many professional subcontracts, coordination is difficult, and on-site management is difficult. The interior design is complex and the space 3D is irregular. For the characteristics of this project, multi-professional design based on complex surfaces. The application of model data extraction and construction will inevitably require the intervention and support of BIM technology.