EPC模式下BIM全过程实践——以南京江北新区人才公寓(一号地块)为例

Practice on BIM Full Lifecycle Implementation in EPC Mode——Taking Project of Jiangbei New District Talent Apartment (No.1 Plot) in Nanjing as an Example

  • 摘要: 南京江北新区人才公寓(一号地块)项目是南京江北新区第一个以设计为龙头的EPC管理项目。该项目在设计和施工中采用BIM协同平台、5D平台为核心工具,并集成多项专项技术,实践了从设计到建造的全过程BIM应用。本文通过对EPC模式下,BIM应用优势和特点的梳理和挖掘,总结项目BIM全过程管理的经验与教训,为提升BIM全过程管理效率和虚拟建造项目技术质量,实现绿色、健康、智慧的百年建筑目标做出了有益的探索。

     

    Abstract: The Jiangbei new district talent apartment (No.1 plot) project in Nanjing is the first EPC management project with an architecture design firm as the leading role in the Jiangbei new area, Nanjing. The project applies both the BIM collaborative platform and the 5D platform as the core tools in the design and construction stages, and integrates a number of special technologies to realize the whole progress BIM application from design to construction. This paper sorts out and mines the advantages and characteristics of BIM application under EPC mode, and summarizes the experience and lessons of BIM application for whole process management in the project, which has made a useful exploration for improving the whole process management efficiency of BIM and the technical quality of virtual construction project, achieving the goal of green, healthy and intelligent centenary building.

     

/

返回文章
返回