Abstract:
For promoting the implementation of BIM Technology in the design and construction of metro station by using Arch-Cover method, this paper has made studies based on the scheme of BIM. According to the characteristics of structure, anchor, and other components during the design and construction process, with the assisting of Revit to make secondary development, a parametric way to support Arch-Cover method has been established to generate the relevant components. In addition, with the adoption of SQL database, a plugin for enabling visual management has been developed. This study has validated the feasibility of the proposed solution through the preliminary experiment in Shikuilu Station in Line 5 of Dalian Metro.