2013, 5(6): 12-16, 38.
地铁盾构双线穿越大型铁路站场引起的既有线路变形分析
1. | 武汉地铁集团有限公司,武汉 430030 |
2. | 华中科技大学 土木学院工程管理研究所,武汉 430074 |
Deformation Analysis of Existing Lines Caused by Metro Shield Double Lines Across a Large Railway Station
1. | Wuhan Metro Group Ltd.Co., Wuhan 430074, China |
2. | Insititute of Construction Management, Huazhong University of Science & Technology, Wuhan 430074, China |
引用本文: 曾铁梅, 左敏, 陈磊. 地铁盾构双线穿越大型铁路站场引起的既有线路变形分析[J]. 土木建筑工程信息技术, 2013, 5(6): 12-16, 38.
Citation: Zeng Tiemei, Zuo Min, Chen Lei. Deformation Analysis of Existing Lines Caused by Metro Shield Double Lines Across a Large Railway Station[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2013, 5(6): 12-16, 38.
摘要:本文依托武汉地铁四号线一期武昌火车站站-梅苑小区站区间盾构隧道下穿武昌火车站国铁站场的工程实例,通过在地表线路和轨枕上布置沉降测点并跟踪施工进程进行监测,探讨地铁盾构隧道施工对地表线路变形的影响,以及盾构隧道下穿国铁线路股道可能出现的风险因素及影响,提出了相应的防护措施。本工程对地表线路和轨枕沉降进行跟踪监测,通过对监测数据的分析及时调整盾构掘进施工参数,保持盾构开挖面的稳定和管片脱出盾尾时及时采用同步注浆、二次注浆来填充盾尾建筑空隙等措施,以确保工程和铁路行车安全。监测结果表明:盾构隧道施工方案是合理可靠的,同时也通过对监测数据的分析,提出关于类似工程施工的一些建议。
Abstract: This paper introduces the engineering example of the first issue of Wuhan no.4 metro line of Wuchang railway station ~ Meiyuan district station which shield tunnel crossed the Wuchang railway station.By arranging observation points in the earths surface and sleeper on the settlement in the lines, the construction process can be monitored.The subway shield tunnel construction influence on surface deformation lines can be discussed, and the corresponding protective measures can be put forward which are caused by the shield tunnel crossing railway station and possible risk factors.In this paper, the project tracked and monitored on surface subsidence line and sleeper.With the monitoring data analysis and timely adjustment of shield tunneling construction parameters, to maintain the stability of the excavation face shield and prolapsed shield tail pipe, and take measures of synchronous grouting, secondary grouting to fill voids shield tail construction and other measures in time to ensure the safety of the projects and railway traffic.Monitoring results showed that shield tunnel construction scheme is reasonable and reliable.By the analysis of the monitoring data, some of the recommendations of the similar construction can be offered.
[1] | |
[2] |
游龙飞, 王效文, 龚彦峰等.盾构下穿新建铁路站场地基预处理技术研究[J].铁道工程学报, 2012(6):105-108. |
[3] | |
[4] |
张印涛, 陶连金, 边金.盾构隧道开挖引起地表沉降数值模拟与实测分析[J].北京工业大学学报, 2006, 32(4):332-337. |
[5] |
陶连金, 孙斌, 李晓霖.超近距离双孔并行盾构施工的相互影响分析[J].岩石力学与工程学报, 2009, 28(9):1856-1862. |
[6] |
徐干成, 李成学, 王后裕等, 地铁盾构隧道下穿京津城际高速铁路影响分析[J].岩土力学, 2009, 30(增2): 269-273. |
[7] | |
[8] |
王建秀, 付慧仙, 朱雁飞.等基于地层损失的盾构隧道地面沉降控制[J].地下空间与工程学报, 2012, 8(3): 570-576. |
[9] | |
[10] |
陈勇, 温超杰, 潘孟.盾构穿越既有火车编组站的施工控制要点[J].建筑施工, 2012, 34(12):1176-1177.doi: 10.3969/j.issn.1004-1001.2012.12.025 |
计量
- PDF下载量(9)
- 文章访问量(1241)
- HTML全文浏览量(940)