2013, 5(2): 96-100.
BIM机电专业应用, 我们是领先了还是落后了?
1. | 中建一局二公司, 北京 102600 |
2. | 中建五局第三建设有限公司, 重庆 400012 |
Are We in the Lead or Backward in Terms of the BIM Mechanical & Electrical Application?
1. | China Construction First Group The Second Construction Co., Ltd., Beijing 102600, China |
2. | China Construction Five Group The Third Construction Co., Ltd., Beijing 400012, China |
引用本文: 苏明, 曹立纲, 谭武. BIM机电专业应用, 我们是领先了还是落后了?[J]. 土木建筑工程信息技术, 2013, 5(2): 96-100.
Citation: Su Ming, Cao Ligang, Tan Wu. Are We in the Lead or Backward in Terms of the BIM Mechanical & Electrical Application?[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2013, 5(2): 96-100.
摘要:本文作者根据两年多的机电总承包施工单位BIM研究与实践, 就机电施工单位最为关心的问题:机电专业综合管汇深化设计以及工程量统计两个方面进行详细的分析, 提出问题和建议。
Abstract: With a more than 2 years' research and practice in BIM(the mechanical and electrical general contracting construction unit)and a detailed analysis, author of this thesis intends to raise his questions and offer some suggestions to the construction unit's most deeply concerned issue, which included the mechanical & electrical comprehensive manifold deepening design and the statistics of engineering project.
计量
- PDF下载量(12)
- 文章访问量(1342)
- HTML全文浏览量(751)