基于BIM的机场航站楼二次结构施工深化流程与协同管理
1. | 重庆机场集团有限公司,重庆 401120 |
2. | 重庆大学,重庆 400044 |
3. | 重庆路先峰科技有限公司,重庆 400044 |
BIM-based Airport Terminal Secondary Structure Construction Deepening Process and Collaborative Management
1. | Chongqing Airport Group Co. Ltd., Chongqing 401120, China |
2. | Chongqing University, Chongqing 400044, China |
3. | Chongqing Road Pioneer Technology Co. Ltd., Chongqing 400044, China |
引用本文: 王洽亲, 马继国, 寇粤, 龚南川. 基于BIM的机场航站楼二次结构施工深化流程与协同管理[J]. 土木建筑工程信息技术, 2024, 16(2): 135-139. doi: 10.16670/j.cnki.cn11-5823/tu.2024.02.23
Citation: Qiaqin Wang, Jiguo Ma, Yue Kou, Nanchuan Gong. BIM-based Airport Terminal Secondary Structure Construction Deepening Process and Collaborative Management[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2024, 16(2): 135-139. doi: 10.16670/j.cnki.cn11-5823/tu.2024.02.23
摘要:随着BIM在工程领域的广泛应用,建筑行业势必会迎来新一轮的技术革新和管理升级。本文以重庆江北国际机场T3B航站楼项目为基础,对BIM在二次结构施工深化流程及协同管理的应用开展深入研究,包括模型维护、深化出图以及指导施工过程中的技术要点和管理方法,并制定相应的协调机制和措施,确保BIM深化成果能够有效指导现场施工。此外,本文总结了二次结构施工深化工作流程、协同管理和应用成果,最终解决了二次结构BIM深化设计中重难点问题,进一步提高了工程质量,缩短了建筑施工工期,节约了施工成本。本项目所应用的技术手段、管理方法和取得的数据、经验,为其它同类项目的二次结构施工起到参考借鉴作用。
Abstract: With the widespread application of Building Information Modeling (BIM) in engineering, the construction industry is bound to witness a new wave of technological innovation and management upgrades. This paper studies on the Chongqing Jiangbei International Airport T3B Terminal project and conducts in-depth research on the application of BIM in the detailed construction process and collaborative management of the secondary structures. This research encompasses model maintenance, detailed drawing development, technical focal points, and management methods to guide the construction process effectively using BIM. Furthermore, corresponding coordination mechanisms and measures are formulated to ensure that the BIM detailed design results can provide effective guidance for on-site construction. Additionally, this paper summarizes the workflow, collaborative management, and application outcomes of the detailed construction of secondary structures, which successfully addresses the challenging issues encountered in BIM detailed design for secondary structures. As a result, it significantly improves engineering quality, shortens construction period, and reduces construction cost. The technological approaches, management methods, and acquired data and experiences employed in this paper are expected to be a reference for the detailed construction of secondary structures in other construction projects.