Abstract:
Taking the complexed curtain wall of a certain super high-rise building as an example, this paper discusses the application of innovative technology, which integrates the BIM technology with industrial digitization, in the drawing and blanking of the curtain wall structure of high-rise building. Comparisons are made with the traditional curtain wall drawing and blanking process, through which embodies the outstanding advantages of the innovative technology integrating BIM and industrial digitization in the works of drawing and blanking of the curtain wall structure.