中央歌剧院剧场项目BIM技术应用

BIM Application in Theatre Project of the Central Opera House

  • 摘要: 中央歌剧院剧场项目位于市中心且施工用地紧张,场地狭小;项目含有多处劲型结构,屋顶具有双曲面造型;内部做法与精装要求高,实施难度大;剧场内部含有大量的舞台设备、机械设施,并要满足声学、视觉效果的要求。利用BIM技术进行合理化场地布置,对不同阶段的场地布置进行模拟优化;通过BIM技术解决劲型结构从设计到生产、施工的高效管控;尝试BIM各类新技术和平台的多方位使用提升对项目的精细化管理水平,培养出一个优秀BIM团队,打造出北京城市的标志性剧院建筑。

     

    Abstract: The Central Opera Theatre project is located in the city center with narrow and limited area on-site for construction. The building possesses many stiffened structures, and the roof is in hyperboloid shape. The internal construction and hardcover inside the building involves many high-level requirements, which causing difficulties in construction practice. There are also numerous stage equipment and mechanical facilities inside the theatre to meet the requirements for acoustic and visual effects. Thus the BIM technology is applied to conduct rational site layout, as well as to optimize site layout at different construction stages. Through the BIM application, the high-efficiency management and control of rigid structure will be implemented throughout the design, production and construction stages. The project also attempts to use various new technologies and platforms of BIM in various directions to improve its fine management level, through which will also develop an excellent BIM team. Meanwhile, hopefully, this project will become a landmark theater building in Beijing.

     

/

返回文章
返回