• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by:China Society and Technology Association
  • Organizer:China Graphics Society
  • Guidance:China Academy of Building Research

column
封面+封底
2017, 9(6)
Abstract PDF
目录
2017, 9(6)
Abstract PDF
Multi Professional 3D Collaborative Design of Pakistan Karot Hydropower Project
Xu Jun, Li Xiaoshuai, Han Xu, Zhang Biyong, Zhang Le
2017, 9(6): 1-6. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.01
Abstract PDF
BIM Application and Creativity in Designing Process of Minmetal Chinasouthern Building
Yan Li, Yao Jian, Xu Jing, Jiang Wei, He Xiangwei, Hong Jing, He Tao
2017, 9(6): 7-15. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.02
Abstract PDF
Study on BIM-based Project Controlling Platform of Wuhan Yangsigang Yangtze River Bridge
Lu Youyue, He Zhiming, Qin Wenbo, Qin Yawei
2017, 9(6): 16-21. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.03
Abstract PDF
Intelligent BIM Maintenance System and BIM+MR Troubleshooting Application based on Mechanized Learning——Through a Case Study of Hospital Building
Li Bingzhan, Luo Ziping, Long Danbing
2017, 9(6): 22-27. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.04
Abstract PDF
Research and Application of Intelligent Operation Management of Urban Utility Tunnel
Yang Dangfeng, Liu Xiaodong, Su Feng, Jia Xinhui, Wu Peipei, Huang Yong
2017, 9(6): 28-33. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.05
Abstract PDF
BIM Application in Shenzhen Subway Line 9 for Collaboration Work in Decoration Project
Chen Hancheng, Hu Yusheng, Luo Lan
2017, 9(6): 34-41. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.06
Abstract PDF
Comprehensive Application of BIM Technology in Nanning Air and Sea Plaza
Zhou Jideng, Peng Xiaoping, Yang Wanyu, Ceng Danmei, Lei Jinyang, Deng Ling, Liang Yubin, Zhou Yujie, Zhou Yang, Shen Huaxin, Zhou Xinyi
2017, 9(6): 42-47. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.07
Abstract PDF
Application of BIM Technology in Mechanical and Electrical Engineering Construction in Li-ling International Ceramic Exhibition Hall
Zhou Peng, Zhang Mingliang, Li Hongxi, Li Yuanbo
2017, 9(6): 48-54. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.08
Abstract PDF
Practice of BIM Application on Residential Decoration Project based on DIM+Platform
Wang Yongchao, Duan Baoqiang, Lian Wenqiang, Luo Lan
2017, 9(6): 55-60. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.09
Abstract PDF
Research on BIM-based 3D Job Instruction
Wang Buyun, Yang Ming
2017, 9(6): 61-66. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.10
Abstract PDF
Research on Extraction of Geological Structure Information of Tunnel Excavation Faces based on Image Processing
Li Pengyun, Zhao Ke, Chen Zidi, Qin Li
2017, 9(6): 67-72. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.11
Abstract PDF
Research on BIM Application in Prefabricated Residential Building Project
Cao Xiaoluo, Liu Jialin
2017, 9(6): 73-77. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.12
Abstract PDF
Full Participation of BIM Management and Application for Intelligent Building——In Administrative Area of Beijing City Center for Example
Li Jinyuan, Sai Han, Feng Jingyi, Huang Zhihua, Wang Zerun
2017, 9(6): 78-82. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.13
Abstract PDF
Dispositional Resistance to BIM-change of Constructors from Perspective of Psychological Capital
Zhou Ji, Yan Zhaoxiang, Tian Yinglin, Zhao Guolu, Dong Bojun
2017, 9(6): 83-88. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.14
Abstract PDF
Research on BIM & GIS-Based Automatic Monitoring System for Tunnel Surrounding Rock Measurement and Its Application
Li Fujian
2017, 9(6): 89-93. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.15
Abstract PDF
Research on Exclusive Cloud Desktop with BIM based on IDC
Chen Changliu, Zhang Kun, Ye Shuaihua
2017, 9(6): 94-98. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.16
Abstract PDF
Study on the Influence of Steel Plate Slotting on Early Cracking Resistance of Steel Plate Reinforced Concrete Shear Wall
Xu Ziran
2017, 9(6): 99-103. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.17
Abstract PDF
Design and Implementation of Information System Development Platform with Distributed Component Infrastructure
Chen Wei, Liu Xinliang, Yuan Yan, Zhou Wenli, Zhao Weidong, Gao Mingqin
2017, 9(6): 104-107. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.18
Abstract PDF
Research on the UWB Positioning on Large-Scaled Construction Site for High-value Equipments and Materials
Feng Kailiang
2017, 9(6): 108-112. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.19
Abstract PDF
Research on Application of Fully Automatic Monitoring Technology for Tunnel
Li Fujian
2017, 9(6): 113-117. DOI: 10.16670/j.cnki.cn11-5823/tu.2017.06.20
Abstract PDF