• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Submit Online

Search

Search Journal

Search Keywords

Vol. 14, No 1, 2022

Display mode :        |     

封面+封底
2022, 14(1): -5--5.
[Abstract](531) [PDF 23045KB](36)
Abstract:
目录
2022, 14(1): -4--4.
[Abstract](1272) [PDF 206KB](40)
Abstract:
封二-第九届BIM技术国际交流会——“BIM助力新城建”会议论文集征文通知
2022, 14(1): -3--3.
[Abstract](643) [PDF 16603KB](20)
Abstract:
封三-《土木建筑工程信息技术》入选武大RCCSE中国核心学术期刊(2020版)
2022, 14(1): -2--2.
[Abstract](550) [PDF 9553KB](14)
Abstract:
封四+封五-《土木建筑工程信息技术》期刊理事会简介与名录
2022, 14(1): -1--1.
[Abstract](482) [PDF 14901KB](10)
Abstract:
封六-《土木建筑工程信息技术》收录简介与第五届编辑委员会
2022, 14(1): 0-0.
[Abstract](475) [PDF 6102KB](9)
Abstract:
On City Information Modeling and Its Basic Data Construction
Dan Geng, Dan Wang
2022, 14(1): 1-6. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.01
[Abstract](1578) [FullText HTML] (781) [PDF 1187KB](65)
Abstract:
City Information Modeling(CIM)is a digital description and expression of the thematic, spatial and temporal characteristics for various city physical objects above ground, underground, indoor and outdoor. It has received widespread attention now, and several cities or districts are carrying out CIM construction pilot projects. However, there is still a lack of systematic and in-depth research on the issues of what CIM is, what characteristics and basic components it has, and how to construct it. Based on the analysis of the concept, essential characteristics and components of CIM, this paper focuses on the main questions of CIM data construction and put forward suggestions to build CIM basic data on the use of the fundamental data in the information system for digitized supervision and management of city, the geo-entity data in the new fundamental surveying and mapping, the results of the joint surveying and mapping for engineering construction project approval, and the housing and infrastructure risk survey information.
Data Integration and Lightweight Technology for Rural Housing
Jiahong Zhang, Shuo Leng, Zhenzhong Hu
2022, 14(1): 7-12. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.02
[Abstract](1383) [FullText HTML] (869) [PDF 1685KB](61)
Abstract:
Rural houses usually combine into villages and are greatly affected by the geographical environment. Therefore, in the process of design and construction, factors such as building information, village information and geographical environment need to be considered at the same time. This study proposes an integration method and a lightweight method for GIS and BIM multi-source data, including an automatic integration method of FBX based on FBX SDK and an improved QEM algorithm for rural housing, which uses vertex importance and model characteristic factor to control the simplification process. The above methods improve an existing rural housing lightweight integration platform from two aspects: expanding the applicable scenarios of the platform and improving the model processing ability of the platform. Taking a village in Xuzhou City, Jiangsu Province as an example, the methods are applicable, practical, and usable. This study promotes the research and application of information technology in rural housing design and construction.
BIM Management and Implementation in Metro Station Project with Arch-Cover Method
Mingquan Hu, Annan Jiang, Honglong Wang, Shuai Zheng, Yan Wang, Yi Tao
2022, 14(1): 13-19. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.03
[Abstract](1297) [FullText HTML] (977) [PDF 1752KB](39)
Abstract:
For promoting the implementation of BIM Technology in the design and construction of metro station by using Arch-Cover method, this paper has made studies based on the scheme of BIM. According to the characteristics of structure, anchor, and other components during the design and construction process, with the assisting of Revit to make secondary development, a parametric way to support Arch-Cover method has been established to generate the relevant components. In addition, with the adoption of SQL database, a plugin for enabling visual management has been developed. This study has validated the feasibility of the proposed solution through the preliminary experiment in Shikuilu Station in Line 5 of Dalian Metro.
The Search of Intelligent Architectural Inspection Glasses Based on BIM and Machine Learning
Yajun Yang, Xuanlu Shi, Xiyan Tang, Xiaoyong Jin, Zhen Xu
2022, 14(1): 20-26. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.04
[Abstract](1656) [FullText HTML] (873) [PDF 2252KB](54)
Abstract:
With the rapid development of BIM industry, the application of BIM combined with artificial intelligence has become a prevalent trend. In order to solve the problems of inconvenient carrying apparatus and unavoidable manual errors in building inspection, intelligent inspection glasses based on BIM and machine learning are designed, which enables the process to be portable and automated.Firstly, building component images are trained based on machine learning to realize component recognition; secondly, information of architectural components should be fetched quickly through the visualization program-Dynamo; finally, Raspberry Pi(RPi)is used to design intelligent inspection glasses, and the detection results can accurately identify the types of building components. This method can not only greatly improve the efficiency of inspection but also make the further integration of BIM technology and artificial intelligence realized.
Empirical Analysis and Research on Market Acceptance and Application Evaluation of Construction Machinery Intelligent Products
Lili Cheng, Huifang Chen, Quanli Dou, Cheng Zhou
2022, 14(1): 27-37. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.05
[Abstract](1680) [FullText HTML] (819) [PDF 4193KB](24)
Abstract:
With the rapid development of the global construction machinery industry, it is the tendency that the construction machinery are being developed toward a more intelligent way. Based on the domestic and foreign literature regarding to the development of intelligent construction machinery, this article summarizes the connotation and characteristics of intelligent construction machinery. By using questionnaire survey method to collect the data and using Spearman methods to analyze the collected data, this research has obtained the results of market acceptance regarding to various types of intelligent construction machinery products in domestic construction machinery market. Also, this research has obtained the results of the preference of interviewee regarding to different products. Moreover, this paper has analyzed the factors that might negatively impact the development of construction machinery, which has provided a basis for the development of intelligent construction machinery in China.
Visual Analysis of Research on BIM and 3D Laser Scanning
Yujie Zhu, Dexuan Zhang, Yuzhong Shen, Jingyuan Sun
2022, 14(1): 38-44. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.06
[Abstract](2043) [FullText HTML] (815) [PDF 2011KB](75)
Abstract:
BIM is advanced in 3D visualization and information coordination, which is being widely adopted in the whole life cycle of building projects. Point cloud data being generated from laser scanner has characteristics in high accuracies and contactless, which is being widely implemented in many areas such as smart cities, heritages protections, and infrastructure surveys. 3D laser scan-based BIM inverse modelling is a new tendency in the development of BIM technology.For objectively reflecting the current research on the BIM+3D scanning technique, this paper has used the visualization software CiteSpace to analyze 166 publication which are being included in the core collection of Web of Science in between 2011 and 2020. The results have shown that: researches are being focused on Model Reconstruction, Point Cloud Segmentation, Machine Learning, and etc.; the number of the publications are keep increasing in recent years; however, the research cooperation in this discipline is not enough; Heriot-Watt University and Poltecn Milan are the two institutions with have most publications; Bosche F. has most publication; United States and Spain are the two countries which have most publications, and then followed by China. The research focus is being transferred from point cloud editing process such as ICP algorithm and Delaunay triangulation method to specific scenario in project management. Meanwhile, research is also focusing on automatic recognition from machine learning to detect components and to manage the information. The problem of interoperability of BIM platform is still waiting to be addressed by researchers from worldwide.
Research on the Whole Process Information Management and Digital Construction Method of Prefabricated Building Based on BIM Technology
Xuanan Huang, Yuexia Shi, Kenan Chen, Fuchuan Jiang, Pingxue Yin
2022, 14(1): 45-60. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.07
[Abstract](2056) [FullText HTML] (839) [PDF 8684KB](95)
Abstract:
China has actively explored new ways to innovate AEC industries starting with prefabricated buildings in recent years. Under the scheme of traditional construction management, high error rate, low efficiency, and poor integration of managing tasks and information during each phase of the construction process are negatively impacting the safety and quality of the building, which is caused by lacking enough collaboration and interaction. Characteristics of prefabricated buildings are being focused on"Standardized Design, Factory Production, Assembly Construction, Integrated Decoration, Information Management, and Intelligent Application". Based on the characteristics of prefabricated building and under the EPC general contracting mode, beginning with the operation and management process from each phase of the project(design, production, and construction), this paper is focusing on finding a more timely, accurately, efficiently, and standardized digital construction and information management method with the adoption of BIM technology.
Application and Practice of COBie Standard in Digital Delivery of Construction Engineering
Wei Di, Qi Jiang
2022, 14(1): 61-68. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.08
[Abstract](1762) [FullText HTML] (1271) [PDF 3317KB](64)
Abstract:
As a standard being used for delivering the data from construction stage to operation stage, COBie is being more mature in recent years and is being supported by many software vendors, and this standard is being adopted in some of the oversea projects. The BIM standard in Shanghai has proposed its own information exchange template for construction-operation based on COBie. The COBie standard is an information exchange standard based on IFC, which is a subset (COBie MVD) extracted from IFC according to the Information Delivery Manual (IDM) between the construction and operation phases. The application of COBie in the digital delivery process needs to consider the demand of the owner in a comprehensive way regarding to the project data, and also need to consider the collection and archive of the data from different project participant under different environment. There is certain requirement toward BIM modelling and data collection process during the implementation of COBie, and also needs different procedures with IFC format and Revit software. COBie enables FM teams, end-users and owners to access data and documents of the facilities and its relevant space in a much convenient way. The transfer of the delivery process from paper-based to digital-based has wide application in the AEC industry.
Construction Safety Risk Inspection of Cable-Stayed Bridge Based on BIM & PtD
Yinzi Wan, Xisheng Li, Qinqin He
2022, 14(1): 69-75. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.09
[Abstract](1336) [FullText HTML] (732) [PDF 2772KB](33)
Abstract:
Focusing on the safety construction of Cable-Stayed bridge, BIM-based(Building Information Modeling-based)and PtD-based(Prevention Through Design-based)methods are being proposed for ensuring the risk control of the construction. The knowledge database for the safety construction(PtD Knowledge Database)of cable-stayed bridge is being established under Access Platform for the determination of those relevant risk factors, pre-control measures, and relevant ID codes. Based on BIM models, Autodesk Revit is being further developed for the establishment of"Cable-Stayed Bridge Construction Safety Risk Inspection Tool(BCSRI)"module with the inclusion of Ribbon menu and WPF interface, which is achieving the automation of Cable-Stayed bridge construction safety risk factors and their IDs inspections during the design stage. The feasibility of the proposed method is being verified by taking the example of safety risks inspections along the Cable-Stayed bridge construction.
Analysis of Application Value and Function Importance of Smart Construction Site
Xiaoqin Wu, Cheng Zhou, Hanbin Luo, Ying Liu
2022, 14(1): 76-85. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.10
[Abstract](1647) [FullText HTML] (663) [PDF 1857KB](56)
Abstract:
For improving the digitalization level in AEC industries, China has widely promoted the adoption and the implementation of smart construction sites. The problems in current stage are focusing on insufficient understandings and lacking enough value due to the smart construction site in China is at the beginning level, which need comprehensive and systematic researches. Therefore, this paper has analyzed and ranked its application value based on the importance by using correlation analysis and factor analysis through the collected data via survey and questionnaires. The highest value in current stage of Chinese smart construction site is the real name registration of the labor. It is commonly agreed that smart construction site has shown its value in different projects. The most important function of smart construction sites in China is the entry identity monitoring based on face recognition, and the research has found that there is little correlation among those functions between different types of smart construction site.Finally, this research has proposed the way to increase the application value in Chinese smart construction site, which can be useful to be implemented real scenarios.
Application of BIM Technology in Complex Multi Curved Building Construction
Xiaomeng Wang, Qingda Hou, Jiayu Lv, Wenjun Chang, Jin Chen, Junjun Li
2022, 14(1): 86-96. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.11
[Abstract](1650) [FullText HTML] (1055) [PDF 3057KB](65)
Abstract:
The PPP project of Fuyang Grand Theater has design innovation. The project is novelty in structure, elegant in posture, and uniqueness in form. The facade of the building is compositing of three rose petals through circular inclined columns, long-span hyperbolic reinforced concrete beams, and special-shaped grid steel structure, which is highlighting the design concept of "Seven Colored Roses". The diagrams of multi-curved structure is difficult to be read. The construction process of circular inclined column and long-span hyperboloid concrete beam is far more complex than that of ordinary reinforced concrete. The hoisting volume of steel structure is large and the form is complex. The traditional reinforced concrete and steel structure construction process can not meet the construction quality and progress requirements of the project. Through BIM Technology, three-dimensional modeling, three-dimensional simulation, numerical extraction, working condition analysis, and other technologies, the research is being carried out in the aspects of wavy concrete ring beam, highly inclined concrete column, and rose petal grid curtain wall for achieving the accurate construction of multi curved composite structure and for providing the references for those subsequent similar projects.
Research on Inspection Method of Elevation Difference of Double Track Line Based on GH
Rui Zhang, Meihua Peng, Wenwen Yu, Kun Wu
2022, 14(1): 97-104. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.12
[Abstract](1397) [FullText HTML] (691) [PDF 1201KB](24)
Abstract:
In the design process of railway project, it needs to strictly control the difference of altitude between two parallel lines. The traditional method based on CAD will require designers to keep inspecting the altitude in base section of two lines for the calculation of difference, which will cause heavy workload and low accuracies.For addressing this problem, this paper is combing Rhino, which is a BIM design software, with the visual programming plugin Grasshopper to design a method to inspecting the altitude difference between two lines, and the reliability of the method are being verified. This method is being used in the JinAo Temple segment of Line 18 in Chongqing Metro, and the proposed solution has achieved the same results compare with the traditional methods, which has validated the effectiveness of the new method. Meanwhile, it also shows that the data analysis and process by using BIM technology can help to improve the efficiencies of railway project, which can lead to the adoption of parametric and lean design.
Research on the Construction of CIM Basic Platform in Tiexi New City
Tianping Bi, Fei Zhou, Xiaoxiao Yang
2022, 14(1): 105-111. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.13
[Abstract](1556) [FullText HTML] (926) [PDF 1848KB](31)
Abstract:
For exploring how to establish a CIM′s basic platform to express and manage the entire 3D elements in urban space, this paper is taking the Tiexi New City of Shenyang as example. Through integrating 484 square kilometers of RS data, foundation of urban GIS data, BIM, underground pipeline information, underground survey information, urban perception information, and other multi-source information, by using Skyline as the 3D basic platform and Oracle as the database, with the adoption of SOA as system architecture and C# as programming language, BIM+GIS+IoT technology has developed for supporting the operation of Tiexi New City. Integration of underground and ground, outdoor and indoor, and static and dynamic has been achieved. The built CIM basic platform has achieved the digitalization of urban physical space of Tiexi New City for the infrastructure of modern city, which not only has provided important supports for the construction of the intelligent city of Tiexi New City, but also has provided a reference for CIM construction of other cities.
Application of BIM Technology in Jinhu Park Project in Xiong′an New District
Runzhi Liu, Mingying Liu, Jianwei Wang, Xiao Hou, Tian Ma, Xiang Shi
2022, 14(1): 112-118. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.14
[Abstract](1591) [FullText HTML] (963) [PDF 1634KB](64)
Abstract:
All the green open spaces in Rongdong area is collectively called for Jinhu Park in Xiong′an new district, which is being designed in strip shape. The challenges in this project are, difficult in earthwork quantification, wide in green area, variety in plants. This paper has solved problems by using BIM technology to create the model, detect the inspection, quantify the road decoration, and delivery the design in a visualized way.For facing the various of plants, code and parameters are being created and assigned. At the same time, the project has been strictly followed the standards of Xiong′an new district, which achieves the visualization, standardization and digitalization of the entire management process for ensuring the construction order of Jinhu Park.
Research on Visualized Facility Management System Based on BIM
Zhihui Miao
2022, 14(1): 119-125. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.15
[Abstract](1546) [FullText HTML] (782) [PDF 1346KB](57)
Abstract:
Facility management is important along the lifecycle of the buildings. Under the traditional scheme of building management, limitations in digitalization and visualization will cause many problems such as poor targeting accuracies and low operation efficiencies during the maintenances, which can hardly satisfy the requirements from facility management team. This paper has elaborated the BIM-based visualized facility management system, has discussed the key technologies in system architecture, and has introduced process and characteristics of this system from the aspects of information management, operation management, spatial management, maintenance management, energy management, and etc. Based on BIM model, through the integration of Internet of Things(IoT), this system is running on Web and Mobile terminal, which can provide a theorical reference for developing facility management system in the future. This paper is focusing on the use case of a VIP terminal of an airport, has analyzed the value of the proposed system in real scenario. Moreover, this paper has found that the value of the system is much relying on the collaboration of project participants despite the existence of sophisticated technologies.
Research on Extraction Method of UAV Building Spatial Features Based on YOLOv3
Ao Sun, Xin Jin, Xiangyuan Guan, Pingfan Shi, Rui Kang, Zhao Xu
2022, 14(1): 126-131. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.16
[Abstract](1535) [FullText HTML] (695) [PDF 1024KB](31)
Abstract:
With the development of smart cities, the requirement of sampling spatial characteristics of building regarding to efficiencies and accuracies are becoming much higher.Focusing on those limitations of current available technologies in AEC market, which is poor of flexibilities, lack of intelligences, and high of labor cost, this paper has proposed a new solution based on UAV(Unmanned Aerial Vehicle)scanning and YOLO(You Only Look Once)recognition to enable the real-time identification and extraction of window components from as-built projects. In this paper, the algorithm of YOLOv3 is being optimized to train the algorithm model by using integrated dataset. Nginx is being used to build RTMP(Real Time Messaging Protocol)for receiving the data from UAV scanning through streaming server for displaying the live results in ground station. The proposed solution has improved the efficiencies of recognition and has reduced the delays of streaming, which reflects the advantages of UAV technologies from the aspects of simultaneous, efficiencies, and intelligences for satisfying those demands in building components detection.
Reform of BIM Teaching in Civil Engineering Major Based on OBE Concept
Xuan Cao, Guofeng Du, Wensheng Li, Shiwei Lu
2022, 14(1): 132-135. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.17
[Abstract](1292) [FullText HTML] (745) [PDF 766KB](29)
Abstract:
With the rapid growth of information technologies in AEC industries, the demand of BIM implementation in domestic AEC market is increasing all the time. However, the big issue is, there is not enough well-trained BIM personnel to fill the gap. Universities and colleges are being responsible for BIM training and education for satisfying the job market. Based on current situation of BIM training and education in domestic institutes, this paper has analyzed the issues in current BIM curriculum. As a result, this paper has proposed a solution to reform the structure of BIM curriculum in Civil Engineering major regarding to coursework, teaching mode, and final project under the scheme of OBE concept.
The Electromechanical Integrated Application of Shanghai Haichang Polar Ocean Park Venues and Pipe Gallery Based on BIM Technology
Jingrong Wu, Na Yang, Nengchao Xiong
2022, 14(1): 136-141. doi: 10.16670/j.cnki.cn11-5823/tu.2022.01.18
[Abstract](1678) [FullText HTML] (787) [PDF 1325KB](63)
Abstract:
Nowadays, BIM technology has penetrated the entire construction industry, from the initial residential and office building projects to large-scale complex complex projects and underground pipe gallery projects, etc. The application of BIM technology in large-scale engineering projects in pipe gallery electrical and mechanical pipes is also a key research direction of BIM technology function. This paper takes Shanghai Haichang Polar Ocean Park as an example to study the comprehensive application of BIM technology in the pipe gallery electromechanical project, which mainly uses BIM technology to review drawings, deepen design, collision inspection and secondary optimization, key and difficult analysis and construction simulation, and then verify the practicability of the BIM technology through actual project. The research results show that BIM technology has great advantages in the design and installation process of pipe gallery and electromechanical project, through BIM technology can avoid ineffective rework and materials waste in the construction phase to achieve the purpose of controlling the project period, saving costs and lean construction, and improving the overall economic benefits of the project.
  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn